Pending approval — not yet published
This document is in the review and approval workflow and is not yet available to staff. It will appear in the WMS library once it has been approved.
← Back to Document LibraryEnvironmental Management Policy
Contents & downloads
Purpose
This policy establishes Westlink Logistics’ commitment to environmental protection, pollution prevention, and sustainable resource use. It provides the framework for setting environmental objectives and integrating environmental considerations into business operations and decision-making.
Scope
This policy applies to all Westlink Logistics operations, employees, contractors, subcontractors, and suppliers. It covers all activities, products, and services that interact with the environment across heavy haulage, project logistics, maritime services, workshop and depot activities, and office-based functions.
Organisational Context
Westlink Logistics operates heavy vehicles, cranes, and maritime vessels across diverse environments including urban, regional, remote, and coastal areas. Environmental aspects include fuel consumption and greenhouse gas emissions, hydraulic and fuel spill risk, noise from transport operations, waste generation from workshop and depot activities, and potential interaction with sensitive ecological and heritage sites.
The organisation operates under the Environmental Protection Act 1986 (WA), the Environment Protection and Biodiversity Conservation Act 1999 (Cth), and applicable licence conditions. Environmental management is integrated with quality and work health and safety management through the Westlink Management System (WMS), certified to ISO 14001, ISO 9001, and ISO 45001.
Policy Statement
Westlink Logistics is committed to:
-
Maintaining an Environmental Management System conforming to ISO 14001:2026 and all applicable environmental legislation, regulations, licence conditions, and codes of practice.
-
Protecting the environment, including prevention of pollution and minimisation of adverse environmental impacts arising from our operations, with particular attention to emissions, spills, noise, and land disturbance.
-
Setting measurable environmental objectives at relevant functions and levels, monitoring performance, and driving continual improvement through the management review process.
-
Using resources sustainably, including fuel, water, energy, and materials, by identifying opportunities to reduce consumption, improve efficiency, and adopt lower-impact alternatives where practicable.
-
Implementing and maintaining waste management practices that prioritise the waste hierarchy and ensure the lawful handling, storage, transport, and disposal of all waste streams including hazardous and regulated waste.
-
Reducing our carbon footprint through fleet modernisation, route optimisation, load consolidation, and consideration of alternative fuel technologies.
-
Identifying and managing environmental risks and opportunities through systematic assessment of environmental aspects and impacts, including those arising from abnormal conditions and reasonably foreseeable emergency situations.
Responsibilities
The Chief Executive Officer is accountable for this policy and for ensuring adequate resources are provided for the effective operation of the Environmental Management System.
The QHSE Manager is responsible for the implementation, maintenance, and continual improvement of the Environmental Management System, including management of the environmental aspects and impacts register, coordination of environmental monitoring, and reporting of environmental performance.
All managers and supervisors are responsible for implementing this policy within their areas of responsibility, ensuring environmental controls are applied, and reporting environmental incidents and spills.
All employees and contractors are responsible for performing work in an environmentally responsible manner, complying with environmental procedures and controls, and reporting any actual or potential environmental harm.
Review
This policy is reviewed annually as part of the management review cycle, or earlier where significant changes occur to the organisation’s environmental aspects, applicable legislation, or the scope of the WMS. This policy is communicated to all personnel and is available to interested parties on request.
Applicable Standards and Legislation
-
ISO 14001:2026 Environmental Management Systems — Requirements
-
ISO 9001:2015 Quality Management Systems — Requirements
-
ISO 45001:2018 Occupational Health and Safety Management Systems — Requirements
-
Environmental Protection Act 1986 (WA)
-
Environment Protection and Biodiversity Conservation Act 1999 (Cth)
Related Documents
-
GOV-POL-001 Quality Policy
-
GOV-POL-002 Work Health and Safety Policy
-
GOV-POL-008 Indigenous Heritage Policy
-
QHSE-MAN-001 Westlink Management System Manual
-
QHSE-PLN-003 Waste Management Plan
-
QHSE-PRO-001 Hazard and Incident Reporting and Investigation Procedure
Compliance coverage — cited by 30 requirements across 4 frameworks
Aboriginal Heritage Act 1972 (WA) + Commonwealth heritage provisions (EPBC + Native Title)(2)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| EPBC-NH-01 | EPBC Act 1999 (Cth) s.15B / s.15C | Partial | Medium | §Policy StatementEnvironmental Management Policy commits to compliance with environmental legislation and to managing significant environmental aspects; EPBC referral assessment for actions near National Heritage places falls within this environmental compliance commitment. |
| EPBC-CH-01 | EPBC Act 1999 (Cth) s.27B / s.27C | Partial | Low | §Policy StatementEnvironmental Management Policy environmental-compliance commitment extends to Commonwealth Heritage place obligations on Commonwealth and Defence sites. |
Environmental Protection Act 1986 (WA)(9)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| EP-WA-49-01 | EP Act 1986 (WA) s.49(2) + s.49(3) | Partial | Medium | §Policy StatementPolicy commits to protecting the environment, including prevention of pollution and minimisation of adverse environmental impacts arising from operations, with particular attention to emissions, spills, noise, and land disturbance — the substantive duty s.49 makes criminal. |
| EP-WA-49A-01 | EP Act 1986 (WA) s.49A(2) + s.49A(3) | Partial | Medium | §Policy StatementPolicy commits to implementing and maintaining waste management practices that prioritise the waste hierarchy and ensure the lawful handling, storage, transport, and disposal of all waste streams including hazardous and regulated waste — the duty s.49A makes criminal where waste is discharged or abandoned without lawful authority or owner consent. |
| EP-WA-50-01 | EP Act 1986 (WA) s.50(1) + s.50(2) | Partial | Medium | §Policy StatementPolicy commits to protecting the environment, prevention of pollution and minimisation of adverse environmental impacts arising from operations (including spills and land disturbance), and to waste management practices that prioritise the waste hierarchy and ensure lawful handling, storage, transport, and disposal — the duties that, breached, become a s.50 offence. |
| EP-WA-50A-01 | EP Act 1986 (WA) s.50A | Partial | Medium | §Policy StatementPolicy commits to identifying and managing environmental risks and opportunities through systematic assessment of environmental aspects and impacts, including those arising from abnormal conditions and reasonably foreseeable emergency situations — the impact-and-risk assessment that prevents a serious-environmental-harm event. |
| EP-WA-50B-01 | EP Act 1986 (WA) s.50B | Partial | Medium | §Policy StatementPolicy commits to environmental protection, pollution prevention and risk-and-aspect assessment — the duty whose breach at the 'material' threshold becomes a s.50B offence. |
| EP-WA-51-01 | EP Act 1986 (WA) s.51 | Partial | Medium | §Policy StatementPolicy commits to maintaining an Environmental Management System conforming to ISO 14001:2026 and all applicable environmental legislation, regulations, licence conditions and codes of practice (which captures prescribed emission standards), and to environmental protection and pollution prevention (which operationalises the take-all-reasonable-and-practicable-measures duty). |
| EP-WA-51C-01 | EP Act 1986 (WA) Part V Div 2 (esp. ss 51C, 51E) | Referenced-only | §Organisational ContextPolicy organisational context notes operation across urban, regional, remote and coastal areas and potential interaction with sensitive ecological and heritage sites — the awareness context for native-vegetation clearing exposure when operating on client tenements. | |
| EP-WA-72-01 | EP Act 1986 (WA) s.72(1) | Full | §ResponsibilitiesPolicy assigns managers and supervisors responsibility for implementing the policy, ensuring environmental controls are applied, and reporting environmental incidents and spills; assigns employees and contractors responsibility for reporting any actual or potential environmental harm. The internal reporting limb is established; the statutory CEO-of-DWER notification trigger and timing is not specified in policy. | |
| EP-WA-73A-01 | EP Act 1986 (WA) s.73A(6) + s.73A(7) | Partial | Medium | §Policy StatementPolicy commits to compliance with all applicable environmental legislation, regulations, licence conditions and codes of practice — captures the duty to comply with statutory notices including a s.73A prevention notice. |
ISO 14001:2026(16)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| ISO14001-2026-4.1-01 | 4.1 | Full | §Organisational ContextEnvironmental Policy §Organisational Context identifies specific environmental aspects. | |
| ISO14001-2026-4.2-01 | 4.2 | Partial | §Organisational ContextEnvironmental Management Policy — commits to legislation and IMS. | |
| ISO14001-2026-4.3-04 | 4.3 | Full | §ReviewPolicy states 'available to interested parties on request'. | |
| ISO14001-2026-5.1-01 | 5.1 | Full | §ResponsibilitiesEnvironmental Policy assigns CEO accountability and resource provision. | |
| ISO14001-2026-5.2-01 | 5.2 | Full | §Policy StatementEnvironmental Policy rev 3 establishes a policy appropriate to the purpose, context, and environmental aspects of Westlink's logistics operations. 2026 cl 5.2 reordering does not change substantive requirements covered by the policy. | |
| ISO14001-2026-5.2-02 | 5.2 | Full | §ReviewPolicy maintained as documented information; communicated within the organisation; available to interested parties on request — per §Review section of GOV-POL-004. | |
| ISO14001-2026-5.3-01 | 5.3 | Full | §ResponsibilitiesEnvironmental Management Policy — commits to EMS implementation. | |
| ISO14001-2026-5.3-02 | 5.3 | Full | §ResponsibilitiesQHSE Manager explicitly responsible for EMS implementation, maintenance, aspects register, monitoring, and performance reporting. | |
| ISO14001-2026-6.1.2-01 | 6.1.2 | Full | §Organisational ContextEnvironmental Management Policy — commits to Carbon footprint reduction; Environmental risk and aspect assessment; environmental aspects. | |
| ISO14001-2026-6.1.2-03 | 6.1.2 | Full | §Organisational ContextEnvironmental Management Policy — commits to Environmental risk and aspect assessment; environmental aspects. | |
| ISO14001-2026-6.1.3-01 | 6.1.3 | Full | §Applicable Standards and LegislationEnvironmental Policy lists EP Act 1986 (WA), EPBC Act 1999, NGER Act 2007. | |
| ISO14001-2026-6.2.1-01 | 6.2.1 | Full | §Policy StatementPolicy commits to 'setting measurable environmental objectives at relevant functions and levels'. | |
| ISO14001-2026-8.1-01 | 8.1 | Full | §Policy CommitmentsEnvironmental Management Policy — commits to Waste management and waste hierarchy. | |
| ISO14001-2026-8.2-01 | 8.2 | Full | §Policy CommitmentsEnvironmental Management Policy — commits to Environmental risk and aspect assessment. | |
| ISO14001-2026-9.3.1-01 | 9.3.1 | Full | §Policy CommitmentsEnvironmental Management Policy — commits to Annual review in management review cycle; Continual improvement through management review. | |
| ISO14001-2026-10.1-01 | 10.1 | Full | §Policy StatementEnvironmental Policy commits to continual improvement through management review. |
JOSCAR-AU 2026(3)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| JOSCAR-Q2.7.3 | Q2.7.3 | Full | Environmental Policy. | |
| JOSCAR-Q2.7.3.1 | Q2.7.3.1 | Full | Environmental Policy published on WMS intranet; included in induction per QHSE-MAN-001. | |
| JOSCAR-Q2.7.3.3 | Q2.7.3.3 | Full | Environmental Policy signed by CEO. |
Declared compliance references (30)
EP-WA-49-01EP-WA-49A-01EP-WA-50-01EP-WA-50A-01EP-WA-50B-01EP-WA-51-01EP-WA-51C-01EP-WA-72-01EP-WA-73A-01EPBC-CH-01EPBC-NH-01ISO14001-2026-10.1-01ISO14001-2026-4.1-01ISO14001-2026-4.2-01ISO14001-2026-4.3-04ISO14001-2026-5.1-01ISO14001-2026-5.2-01ISO14001-2026-5.2-02ISO14001-2026-5.3-01ISO14001-2026-5.3-02ISO14001-2026-6.1.2-01ISO14001-2026-6.1.2-03ISO14001-2026-6.1.3-01ISO14001-2026-6.2.1-01ISO14001-2026-8.1-01ISO14001-2026-8.2-01ISO14001-2026-9.3.1-01JOSCAR-Q2.7.3JOSCAR-Q2.7.3.1JOSCAR-Q2.7.3.3
Document Revision Summary
| Rev | Issued | Document Ref | Document Title | Author | Approved |
|---|---|---|---|---|---|
| 1 | 24/05/2021 | WLK-GBL-GOV-POL-004 | Environmental Management Policy | CEO (JDG) | CEO (JDG) |
| 2 | 09/03/2026 | GOV-POL-004 | Environmental Management Policy | FTM (CF) | CEO (JDG) |
| 3 | 12/03/2026 | GOV-POL-004 | Environmental Management Policy | FTM (CF) | CEO (JDG) |
Document Revision Details
| Rev | Purpose of revision and changes made |
|---|---|
| 3 | Added Organisational Context section (ISO 14001:2015 cl.4.1) — grounds the policy in Westlink's specific environmental aspects: fuel/emissions, spill risk, noise, waste, and sensitive site interaction.• Added legislative context — Environmental Protection Act 1986 (WA), EPBC Act 1999, and applicable licence conditions now framed in organisational context alongside IMS certification.• Reduced policy commitments from 9 to 7 — removed supplier communication (belongs in procurement procedures) and paper reduction (too granular for policy level). Tightened language throughout.• Removed climate change preamble from policy statement — carbon footprint reduction retained as a specific commitment without the narrative framing.• Added IMS triad to applicable standards — ISO 9001 and ISO 45001 added alongside ISO 14001 to reflect integrated management system.• Curated cross-references — added IMS policy triad (Quality, WHS), Risk Management Policy, and Waste Management Plan. Removed auto-discovered tangential references.• Review section now references management review cycle and external availability (cl.5.2 requirements). |