← Back to Document LibraryWestlink Management System Manual
Contents & downloads
Nomenclature
| Term | Definition |
|---|---|
| AMSA | Australian Maritime Safety Authority |
| ASIC | Australian Securities and Investments Commission |
| CoR | Chain of Responsibility |
| DISP | Defence Industry Security Program |
| E8 | Essential Eight (ASD cybersecurity mitigation strategies) |
| EPA | Environmental Protection Authority (WA) |
| EWP | Elevated Work Platform |
| HSE | Health, Safety and Environment |
| HSES | Health, Safety, Environment and Security |
| IMS | Integrated Management System |
| ISM | Information Security Manual (Australian Government) |
| ISO | International Organization for Standardization |
| JHA | Job Hazard Analysis |
| JOSCAR | Joint Supply Chain Accreditation Register |
| LTIFR | Lost Time Injury Frequency Rate |
| NHVR | National Heavy Vehicle Regulator |
| PCBU | Person Conducting a Business or Undertaking |
| PDCA | Plan-Do-Check-Act |
| PPE | Personal Protective Equipment |
| PSPF | Protective Security Policy Framework |
| RACI | Responsible, Accountable, Consulted, Informed |
| SWMS | Safe Work Method Statement |
| TBOSIET | Tropical Basic Offshore Safety Induction and Emergency Training |
| TRIFR | Total Recordable Injury Frequency Rate |
| WHS | Work Health and Safety |
| WMS | Westlink Management System |
Purpose
This manual describes the Westlink Management System (WMS) — the integrated management system through which Westlink Logistics Pty Ltd manages quality, work health and safety, and environmental performance across all operations.
The WMS provides the framework for setting objectives, controlling risks, meeting statutory and regulatory obligations, fulfilling customer and defence requirements, and driving continual improvement. It is certified to ISO 9001:2015, ISO 45001:2018, and ISO 14001:2026.
This manual serves as the top-level system document. It describes what the WMS achieves and how its elements interact. Detailed procedures, work instructions, and forms are referenced throughout and maintained as controlled documents within the WMS library.
Scope
Integrated Management System Boundary
The WMS covers all activities performed by Westlink Logistics Pty Ltd in the provision of specialised logistics services. The system integrates the requirements of three international standards:
-
ISO 9001:2015 — Quality Management Systems
-
ISO 45001:2018 — Occupational Health and Safety Management Systems
-
ISO 14001:2026 — Environmental Management Systems
Services
Westlink Logistics provides specialist heavy and oversized logistics services to the energy, mining, rail, infrastructure, and defence sectors. Services include:
-
Marine transportation, chartering, and port services
-
Heavy haulage and road transport
-
Lifting and rigging operations
-
Air transportation and charter
-
Customs processing, quarantine, and freight forwarding
-
Project management and technical assurance
Sites and Operations
The WMS applies to all Westlink operations in Australia and Singapore. The principal office is in Perth, Western Australia, with regional operations in Queensland. Singapore-based personnel and operations are managed directly under Westlink Logistics Pty Ltd.
Workforce
The WMS applies to all workers as defined by the Work Health and Safety Act 2020 (WA), including employees, contractors, subcontractors, labour hire, volunteers, and visitors to Westlink workplaces or worksites.
Exclusions
| ISO Clause | Exclusion | Justification |
|---|---|---|
| ISO 9001:2015 cl.7.1.5 | Monitoring and measuring resources | Westlink does not use monitoring or measuring equipment to verify conformity of products or services. Service conformity is verified through inspection, client acceptance, and documentation review. |
Design and Development (cl 8.3)
Design and development (ISO 9001:2015 cl 8.3) is within the scope of the WMS. Westlink designs bespoke logistics and transport-engineering solutions — including project-freight method engineering, modularisation and transport-engineering design, bespoke warehouse and contract-logistics operating models, and custom system configurations — and controls this design and development under OPS-PRO-004 (Solutions Design Procedure). The straightforward forwarding of freight against a fully specified client instruction, where there is no solution to be designed, is operational service provision under cl 8.1 and is not design and development.
Management System Overview
Document Hierarchy
The WMS documentation follows a four-tier hierarchy. Each tier serves a distinct purpose and is controlled through the document management process described in GOV-PRO-002.
| Tier | Document Type | Purpose | Examples |
|---|---|---|---|
| 1 | Policies | State commitments and intent. Set direction for the management system. | GOV-POL-001 (Quality), GOV-POL-002 (WHS), GOV-POL-004 (Environmental) |
| 2 | Manuals and Standards | Describe the management system structure, requirements, and criteria. | QHSE-MAN-001 (this manual), GOV-STD-001 (Document Management Standard) |
| 3 | Procedures, Plans, and Guidelines | Define how activities are performed, controlled, and recorded. | QHSE-PRO-001 (Incident Reporting), QHSE-PLN-003 (Environmental Management Plan) |
| 4 | Forms, Templates, Checklists, Registers, Schedules | Capture records and evidence of conformity. | QHSE-FRM-001, QHSE-CHK-001, GOV-SCH-001 (Retention Schedule) |
All WMS documents follow the naming convention {Department}-{DocType}-{Sequence} as defined in GOV-STD-001. The WMS library is maintained on SharePoint with version control, approval workflows, and classification markings per the Protective Security Policy Framework (PSPF) 2025.
Order of Precedence
Where conflict exists between documents, the following order of precedence applies:
-
Applicable legislation, including mandatory standards and codes of practice
-
Company policies (Tier 1)
-
This manual and WMS standards (Tier 2)
-
Supporting procedures, plans, and guidelines (Tier 3)
Process Model
The WMS operates on a Plan-Do-Check-Act (PDCA) cycle applied to all business processes. Core process interactions are:
-
Client requirements and regulatory obligations define inputs to operational planning.
-
Operational processes (marine, land, air, chartering, project management) deliver services under controlled conditions.
-
Support processes (competence, communication, document control, procurement) enable operational delivery.
-
Performance evaluation (monitoring, audit, management review) measures effectiveness and identifies improvement opportunities.
-
Improvement processes (incident investigation, corrective action, continual improvement) close the PDCA loop.
System Platform
Westlink uses the isCompliant platform to manage operational WMS processes including risk and opportunity registers, audit scheduling, corrective actions, supplier management, personnel records, hazardous substances, environmental controls, emergency planning, company objectives, incident reporting, and meeting management. The platform provides automated RACI assignment, overdue alerts, and compliance tracking.
The WMS document register is maintained on SharePoint. Finance and direct client CRM are managed in separate systems. The principles described in this manual apply regardless of the platform used to implement them.
Context and Interested Parties
Understanding the Organisation and its Context
Westlink Logistics is a specialist heavy and oversized logistics provider with over 25 years of experience serving the energy, mining, rail, infrastructure, and defence sectors. The company operates from Perth, Western Australia, with regional operations in Queensland and Singapore.
Westlink determines external and internal issues relevant to its strategic direction and the intended outcomes of the WMS through a structured context analysis. The analysis is reviewed at each management review and updated when significant changes occur.
External Issues
-
Regulatory environment — WHS legislation (WA and Cth), environmental protection, chain of responsibility, dangerous goods, privacy, and modern slavery obligations
-
Defence requirements — DISP membership, ISM compliance, JOSCAR pre-qualification, and client security requirements
-
Market conditions — commodity cycles in energy and mining, infrastructure investment, defence procurement timelines
-
Climate and environmental — physical risks to transport operations (cyclones, flooding, heat), transition risks from decarbonisation policy, client sustainability requirements
-
Supply chain — vessel and equipment availability, subcontractor capacity, port and road infrastructure constraints
Internal Issues
-
Organisational capability — workforce competence, restricted operation licensing, succession planning for specialist roles
-
Operational complexity — multi-modal logistics (marine, land, air) across multiple jurisdictions and client sites
-
Technology — information security controls, platform reliability, digital record-keeping, and business continuity
-
Culture — safety-first culture, stop work authority, consultation and worker participation
Interested Parties
Westlink identifies interested parties whose needs and expectations are relevant to the WMS. The interested parties register is maintained in the management system platform and reviewed at each management review.
| Interested Party | Needs and Expectations | Relevant WMS Requirements |
|---|---|---|
| Clients (energy, mining, defence, infrastructure) | Safe, timely, quality service delivery; regulatory compliance; security clearances; incident-free operations | Operational controls, KPIs, incident reporting, client communication |
| Workers (employees, contractors, subcontractors) | Safe workplace; fair conditions; consultation; competence development; return-to-work support | WHS policy, hazard management, consultation, training, rehabilitation |
| Regulators (WorkSafe WA, EPA, DISP, AMSA, NHVR) | Legislative compliance; incident notification; audit access; records availability | Legal register, incident reporting, audit programme, records management |
| Defence (DISP, Prime contractors) | Security compliance; ISM/E8 controls; personnel security; JOSCAR pre-qualification; classified information handling | Defence security policy, personnel screening, information security, audit evidence |
| Certification bodies | Conformity to ISO 9001, ISO 45001, ISO 14001; continual improvement evidence; management commitment | All WMS processes, management review, internal audit, corrective action |
| Suppliers and subcontractors | Clear requirements; fair evaluation; timely payment; safety expectations | Procurement controls, contractor management, prequalification |
| Insurers | Risk management; incident data; claims management; loss prevention | Risk registers, incident reporting, WHS performance data |
| Community and environment | Pollution prevention; noise and traffic management; heritage protection; responsible operations | Environmental policy, aspects register, emergency response, indigenous heritage |
Leadership and Policy
Leadership and Commitment
The CEO demonstrates leadership and commitment to the WMS by establishing quality, WHS, and environmental policies, ensuring the WMS achieves its intended outcomes, directing and supporting persons to contribute to WMS effectiveness, promoting continual improvement, and ensuring adequate resources are available.
All managers demonstrate leadership within their areas of responsibility. Stop work authority is granted to all personnel, including subcontractors and visitors, without fear of reprisal.
Organisational Structure
The following table shows the current Westlink organisational structure and key WMS responsibilities.
| Role | Name | Reports To | Key IMS Responsibilities |
|---|---|---|---|
| Board of Directors | — | Shareholders | Governance oversight, strategic direction, CEO appointment |
| Chief Executive Officer | John A. Di Giovanni | Board | Overall accountability for IMS, policy approval, management review chair, resource allocation |
| Finance & Technology Manager | Craig Foreman | CEO | CFO, CTO, CISO, CSO functions; information security; DISP security officer; document control; compliance oversight |
| Operations Manager | Rob Carbon | CEO | Operational WHS and quality; project delivery; client requirements; subcontractor management |
| Account & Freight Operations Manager | Aureen Scott | CEO | Freight operations quality; customs compliance; client account management |
| Business Development Manager | Lyndon Canton | CEO | Tender compliance; client requirements capture; JOSCAR and prequalification submissions |
| Regional Manager QLD | Brian Harrington | CEO | QLD operations WHS and quality; regional compliance; site safety management |
| Chartering Manager | Manu Kohli | CEO | Marine chartering quality; vessel compliance; maritime safety obligations |
| Technical Manager | Tom Maher | Operations Manager | Technical assurance; lifting and rigging compliance; equipment certification |
A Schedule of Delegation to Management defines financial and operational authority limits. The CEO may delegate specific WMS responsibilities but retains overall accountability.
Policy Framework
The WMS is governed by a suite of policies that establish commitments across quality, WHS, environmental, governance, and security domains. Each policy is approved by the CEO, reviewed annually at management review, and available to interested parties on request.
| Ref | Policy Title | Primary Standard/Obligation |
|---|---|---|
| GOV-POL-001 | Quality Policy | ISO 9001:2015 cl.5.2 |
| GOV-POL-002 | Work Health and Safety Policy | ISO 45001:2018 cl.5.2 |
| GOV-POL-003 | Drug and Alcohol Policy | WHS Act 2020 (WA) s.19 |
| GOV-POL-004 | Environmental Management Policy | ISO 14001:2026 cl.5.2 |
| GOV-POL-005 | Fitness for Work Policy | WHS Act 2020 (WA) s.19 |
| GOV-POL-006 | Workplace Behaviour Policy | Fair Work Act 2009 (Cth) |
| GOV-POL-007 | Workplace Rehabilitation and Return to Work Policy | WC&IM Act 2023 (WA) |
| GOV-POL-008 | Indigenous Heritage Policy | Aboriginal Heritage Act 1972 (WA) |
| GOV-POL-009 | Equal Employment Opportunity Policy | Equal Opportunity Act 1984 (WA) |
| GOV-POL-010 | Inclusion and Diversity Policy | Fair Work Act 2009 (Cth) |
| GOV-POL-011 | Grievance Resolution Policy | Fair Work Act 2009 (Cth) |
| GOV-POL-012 | Anti-Bribery and Corruption Policy | Criminal Code Act 1995 (Cth) Div 70 |
| GOV-POL-013 | Modern Slavery Policy | Modern Slavery Act 2018 (Cth) |
| GOV-POL-014 | Sexual Harassment Prevention Policy | Sex Discrimination Act 1984 (Cth) |
| GOV-POL-015 | Privacy Policy | Privacy Act 1988 (Cth) |
| GOV-POL-016 | Social Media Usage Policy | Fair Work Act 2009 (Cth) |
| GOV-POL-017 | Stop Work Authority Policy | WHS Act 2020 (WA) s.84 |
| GOV-POL-018 | Whistleblower Policy | Corporations Act 2001 (Cth) Part 9.4AAA |
| GOV-POL-019 | Gifts, Hospitality and Conflicts of Interest Policy | Criminal Code Act 1995 (Cth) Div 70 |
| TEC-POL-001 | Information Security Policy | ISM (June 2025); PSPF 2025 |
| QHSE-POL-001 | Chain of Responsibility Policy | Road Traffic (Vehicles) Act 2012 (WA) Part 4 |
Planning
Risk-Based Approach
Westlink applies a risk-based approach to all WMS processes, aligned with ISO 31000:2018. Risks and opportunities are identified, assessed, and treated at strategic, operational, and project levels. The risk management process is detailed in QHSE-PRO-002.
Hazard Identification and WHS Risk
Hazard identification is performed proactively through workplace inspections, job hazard analyses (JHAs), safe work method statements (SWMS), pre-start meetings, and worker consultation. The hierarchy of controls (elimination, substitution, isolation, engineering, administrative, PPE) is applied to all hazard treatments. The process is detailed in QHSE-PRO-001.
Environmental Aspects and Impacts
Westlink identifies environmental aspects and evaluates their impacts using a significance assessment methodology. Significant aspects include fuel consumption and emissions, waste generation, spill risk during marine and land transport, noise at operational sites, and heritage site interaction. The environmental aspects register is maintained in the management system platform and reviewed annually.
Legal and Other Requirements
Westlink maintains a legal register identifying all applicable legislation, regulations, codes of practice, standards, and client contractual requirements. The register is monitored through:
-
State Law Publisher email subscriptions (WA legislation)
-
WorkSafe WA newsletters and guidance updates
-
Fair Work Australia newsletters and updates
-
ATO and ASIC regulatory updates
-
Defence industry notifications (DISP, ISM updates)
-
Certification body communications (audit findings, standard revision notices)
Compliance is evaluated periodically as described in the performance evaluation section of this manual.
Objectives
Westlink establishes measurable objectives for quality, WHS, and environmental performance. Objectives are set at management review, communicated to relevant personnel, monitored through KPIs, and updated when conditions change. Current objectives are maintained in the management system platform.
| Domain | Objective | Metric | Target | Frequency |
|---|---|---|---|---|
| Quality | Deliver services right first time | Client nonconformity reports | < 2 per quarter | Quarterly |
| Quality | Maintain client satisfaction | Client feedback score (verbal/formal) | > 80% positive | Annually |
| WHS | Reduce workplace injuries | Total Recordable Injury Frequency Rate (TRIFR) | < 5.0 | Monthly |
| WHS | Zero fatalities and serious incidents | Lost Time Injury Frequency Rate (LTIFR) | 0 | Monthly |
| WHS | Close corrective actions on time | CA closure within 30 days | > 90% | Monthly |
| Environmental | Prevent environmental incidents | Reportable environmental incidents | 0 | Annually |
| Environmental | Reduce waste to landfill | Waste diversion rate | > 60% | Annually |
Note: Objectives and targets are reviewed and updated at each management review. The values shown are current-period examples. The management system platform maintains the authoritative register of objectives and progress.
Management of Change
Changes to the WMS, operations, or organisational structure are managed through a structured process that identifies the change, assesses risks and impacts, plans implementation, communicates to affected parties, and verifies effectiveness. Changes that affect the scope or structure of the WMS are approved by the CEO.
Support
Resources
The CEO ensures adequate resources are available for WMS implementation and continual improvement. Resources include personnel with appropriate competence, infrastructure (offices, IT systems, vehicles, equipment), and a work environment appropriate for service delivery. Resource requirements are assessed at management review and during project planning.
Competence
Westlink determines the competence required for each role that affects WMS performance. Competence is established through a combination of education, training, qualifications, and experience. The process includes:
-
Pre-employment verification: CV review, reference checks, interview assessment, qualification verification, pre-employment medical, right to work in Australia
-
Induction: WMS orientation, site-specific induction, role-specific training requirements
-
Ongoing development: performance appraisals, training needs analysis, refresher training, competence reassessment
-
Prior learning: recognition of prior training and experience is accepted only where documented evidence is provided
Restricted Operations
The following operations require specific licences, tickets, or certifications. Personnel must not perform these operations without verified, current credentials.
| Restricted Operation | Licence/Ticket Required |
|---|---|
| Electrical work | WA Electrical Licence |
| Vehicle and mobile plant operation | Relevant class of driver’s licence or high-risk work licence |
| Offshore operations | TBOSIET (Tropical Basic Offshore Safety Induction and Emergency Training) |
| Confined space entry | High-risk work licence (confined spaces) |
| Scaffolding | High-risk work licence (scaffolding) |
| Rigging | High-risk work licence (rigging) |
| Crane and hoist operation | High-risk work licence (relevant class) |
| Reach stacker operation | Reach stacker competency |
| Boom-type EWP operation | High-risk work licence (EWP > 11m) |
| Working at heights | Working at heights training |
Awareness
Westlink ensures all workers are aware of the quality, WHS, and environmental policies, relevant objectives, their contribution to WMS effectiveness, the implications of not conforming to WMS requirements, and relevant incidents and lessons learned. Awareness is maintained through induction, toolbox talks, pre-start meetings, noticeboards, and the management system platform.
Personnel files are maintained for all workers and include: resume, letter of employment, induction records, employee details, bank and superannuation details, qualifications and certificates, tax declarations, and performance records.
Communication and Consultation
Westlink maintains structured internal and external communication processes. Worker consultation on WHS matters is a legislative requirement under the WHS Act 2020 (WA) and a core element of the WMS.
| Communication Type | Method | Frequency | Owner |
|---|---|---|---|
| WHS performance | Graphical reports on intranet/noticeboards | Monthly | Finance & Technology Manager |
| HSE meetings | Face-to-face meetings with all personnel | Monthly | Operations Manager |
| Pre-start/toolbox | Toolbox talks and daily pre-start briefings | Daily (when active on site) | Project Manager / Supervisor |
| Management review | Formal review meeting | Annually | CEO |
| Client project meetings | Meetings per contract requirements | Per contract schedule | Project Manager |
| Board reporting | Board meeting papers | Monthly | CEO |
Client feedback is captured through project meetings, verbal feedback, and formal records in the management system platform. Westlink actively seeks client input at project milestones and completion.
Documented Information
The WMS requires documented information to be created, updated, and controlled in accordance with GOV-STD-001 (Document Management Standard) and GOV-PRO-002 (Document Control Procedure). Key controls include:
-
Approval and review: all documents are approved by designated authorities before release and reviewed at defined intervals
-
Version control: SharePoint manages version history, check-in/check-out, and prevents concurrent editing conflicts
-
Classification: documents are classified per PSPF 2025 (UNOFFICIAL, OFFICIAL, OFFICIAL:Sensitive) and marked accordingly
-
Retention and disposal: records are retained in accordance with GOV-SCH-001 (Document Retention Schedule) and applicable legislative requirements
-
Accessibility: current versions are available at point of use via the WMS library; obsolete documents are removed from active circulation
-
Employee files are never deleted. Auditable records include induction records, training registers, SWMS/JHAs, incident reports, investigation and corrective action records, workers’ compensation claims, rehabilitation records, safety data sheets, environmental incident records, safety inspections, and audit reports.
Operations
Operational Planning and Control
Westlink plans, implements, and controls operational processes to meet requirements for service delivery. Operational planning considers client requirements, applicable legislation, risk assessments, resource availability, WHS hazards, and environmental aspects. Controls are proportionate to the risk and complexity of each operation.
Client Requirements
Client requirements are determined through tender review, contract negotiation, and ongoing project communication. Requirements include service specifications, delivery schedules, safety and environmental obligations, security clearances, and reporting expectations. Changes to requirements are managed through the management of change process.
| Approval Type | Approval Authority |
|---|---|
| Tenders and quotes | Operations Executive / Senior Project Manager |
| Timesheets | Project Manager |
| Contractual documents | Per Schedule of Delegation |
| Purchase orders | Per Schedule of Delegation |
| Project deliverables | Project Manager |
Supplier and Subcontractor Management
External providers are controlled based on their impact on service quality, WHS, and environmental performance. Westlink applies a tiered prequalification process:
-
Major suppliers: formal prequalification per GOV-PRO-003, including WHS, environmental, and quality capability assessment
-
Minor suppliers: prequalification per GOV-PRO-005, with scope limited to the specific service provided
-
Performance monitoring: three deficiency instances in a rolling six-month period triggers reassessment of approved supplier status
-
Contractor WHS requirements are specified in QHSE-GDL-001 (Minimum HSES Requirements for Contractors)
Chain of Responsibility
As a PCBU involved in the transport supply chain, Westlink has chain of responsibility (CoR) obligations under the Road Traffic (Vehicles) Act 2012 (WA) Part 4. CoR obligations apply to loading, scheduling, speed, fatigue management, vehicle standards, mass, dimension, and maintenance. The CoR framework is detailed in QHSE-POL-001.
WHS Operational Controls
Westlink applies the hierarchy of controls to eliminate or minimise WHS risks so far as is reasonably practicable. Operational WHS controls include:
-
Safe work method statements (SWMS) for all high-risk construction work and other activities assessed as high risk
-
Job hazard analyses (JHAs) for non-routine tasks and new work activities
-
Site safety plans for client sites, addressing site-specific hazards, emergency arrangements, and communication protocols
-
Permit-to-work systems for confined spaces, hot work, isolation, and other high-risk activities
-
PPE requirements determined by risk assessment and client site requirements
-
Health surveillance for workers exposed to noise, hazardous chemicals, and other health hazards per WHS Regulations 2022 (WA)
Environmental Operational Controls
Westlink implements controls to prevent pollution, reduce environmental impact, and meet client and regulatory requirements. Key environmental controls include:
-
Spill prevention and response: spill kits on all vehicles and worksites, spill response training, containment procedures
-
Waste management: waste segregation, licensed waste contractors, waste tracking, and diversion from landfill targets
-
Dangerous goods: handling, storage, and transport per Dangerous Goods Safety Act 2004 (WA) and relevant regulations
-
Noise and dust: operational controls at worksites to minimise community impact
-
Heritage protection: indigenous heritage assessment and management per GOV-POL-008
Life Cycle Perspective
Consistent with ISO 14001:2026 cl.8.1, Westlink determines and applies environmental controls across the life cycle stages of the services it provides and the assets it operates. The life cycle stages considered are acquisition, use, maintenance, and end-of-life treatment or disposal. Westlink does not design physical products, so design-stage controls focus on service design (load planning, route selection, modal choice) and asset specification.
-
Acquisition: fleet and plant procurement specifications include emissions class, fuel efficiency, and reparability criteria; supplier and subcontractor prequalification (GOV-PRO-003, GOV-PRO-005) flows environmental requirements down to external providers.
-
Service design: route, modal, and load planning consider fuel consumption and emissions intensity; client requirement reviews capture environmental obligations imposed by the client or end use.
-
Use: operational controls (fuel monitoring, spill prevention, waste segregation, noise and dust management) apply across the use phase of vehicles, plant, and operational sites.
-
Maintenance: planned maintenance regimes for fleet and lifting equipment include environmental considerations (oil and coolant containment, replacement-part disposal, refrigerant handling).
-
End-of-life: vehicles, plant, batteries, tyres, and IT assets are disposed of through licensed recyclers or end-of-life contractors; disposal records form part of the environmental aspects register and retention schedule (GOV-SCH-001).
-
External communication: environmental requirements relevant to transportation, delivery, use, and end-of-life of client cargo are communicated to subcontractors through contract terms and to clients through project communications, in accordance with ISO 14001:2026 cl.8.1 d).
Emergency Preparedness and Response
Westlink maintains emergency response procedures to prepare for and respond to potential emergency situations that could affect worker safety, the environment, or operations. Emergency arrangements are detailed in QHSE-PRO-007 and include:
-
Emergency response plans for each operational site and project
-
Trained first aiders and emergency wardens
-
Regular emergency drills and exercises
-
Communication protocols for notifying regulators, clients, and emergency services
-
Post-incident review and plan updates
Performance Evaluation
Monitoring, Measurement, and Analysis
Westlink determines what needs to be monitored and measured, the methods for monitoring and measurement, when monitoring and measuring must be performed, and when results must be analysed and evaluated.
| Performance Area | Key Metrics | Data Source | Reporting Frequency |
|---|---|---|---|
| Quality — audit effectiveness | Action close-out rate, frequency, timeliness | Management system platform | Quarterly |
| WHS — injury performance | LTIFR, TRIFR, injury by severity and body part | Management system platform + finance system | Monthly |
| WHS — lead indicators | Hazard reports, inspections completed, training compliance | Management system platform | Monthly |
| Environmental — incident performance | Environmental incidents, spills, regulatory notices | Management system platform | Quarterly |
| Environmental — resource consumption | Fuel use, waste volumes, diversion rate | Operational records | Annually |
| Competence | Performance appraisals completed vs headcount | Management system platform | Annually |
| Legislation compliance | Compliance audit results, regulatory notices | Management system platform | Per audit schedule |
Calibrated and Verified Monitoring Equipment
Consistent with ISO 14001:2026 cl.9.1.1 and ISO 9001:2015 cl.7.1.5, Westlink ensures that monitoring and measurement equipment used to demonstrate conformity of environmental and quality performance is calibrated or verified at specified intervals, identified to determine its calibration status, and safeguarded from adjustments that would invalidate results. A calibrated and verified equipment register is maintained linked to the environmental aspects register.
| Equipment Type | Purpose | Verification Method | Frequency |
|---|---|---|---|
| Fuel flow meters / telematics | Fuel consumption and emissions intensity | OEM service certificate or licensed-installer verification | Annual |
| Noise meters | Worksite noise level measurement | Field calibrator pre-use; laboratory calibration | Pre-use (field); annual (laboratory) |
| Weighbridges and load cells | Mass measurement (CoR, waste mass) | NMI-traceable verification | Annual or per regulator schedule |
| Spill volume measurement | Spill quantity reporting | Calibrated graduated containers; estimation guide | Verified on issue and annually |
| Gas detectors (confined-space, hot work) | Atmospheric monitoring | Bump test pre-use; full calibration per manufacturer | Pre-use (bump); 6-monthly (calibration) |
Equipment found out of calibration is removed from service and the validity of previous measurements assessed. Calibration and verification records are retained in accordance with GOV-SCH-001.
Client Satisfaction
Westlink monitors client satisfaction through project meetings, verbal feedback, formal feedback records, and post-project reviews. Client feedback is recorded in the management system platform and analysed for trends at management review. Major clients have scheduled meetings for regular feedback exchange.
Internal Audit
Westlink conducts internal audits at planned intervals to verify that the WMS conforms to the requirements of ISO 9001, ISO 45001, ISO 14001, and Westlink’s own WMS requirements. The internal audit programme considers the importance of processes, changes affecting the organisation, and results of previous audits.
-
Audit frequency: at least annually for each WMS process, with additional audits triggered by incidents, changes, or poor performance
-
Auditor competence: internal auditors are independent of the activity being audited and trained in audit techniques
-
Audit results: findings are classified as nonconformities, observations, or opportunities for improvement and tracked through the corrective action process
Management Review
The CEO chairs an annual management review to assess the continuing suitability, adequacy, and effectiveness of the WMS. The quorum for management review is the CEO and the external QHSE Consultant. Attendees include the Finance & Technology Manager, Operations Manager, senior project managers, and others as required.
Management Review Inputs
-
Status of actions from previous management reviews
-
Changes in external and internal issues relevant to the WMS
-
WMS performance data: quality, WHS, and environmental KPIs; nonconformities and corrective actions; audit results; compliance evaluation results
-
Client satisfaction and feedback
-
Adequacy of resources
-
Effectiveness of actions to address risks and opportunities
-
Opportunities for continual improvement
Management Review Outputs
-
Decisions on continual improvement opportunities
-
Changes needed to the WMS
-
Resource requirements
-
Updated objectives and targets for the next period
Management review records are retained in the management system platform. Actions arising from management review are tracked through the corrective action process.
Health Surveillance
Workers exposed to health hazards (noise, hazardous chemicals, asbestos, silica) undergo health surveillance as required by WHS Regulations 2022 (WA). Surveillance programmes are determined by risk assessment and monitored for trends. Health surveillance records are maintained as confidential personnel records.
Improvement
Incident Investigation
All incidents, near misses, and hazards are reported and investigated in accordance with QHSE-PRO-001. Investigation depth is proportionate to the actual or potential severity of the event. The investigation identifies root causes, not just immediate causes, and determines corrective actions to prevent recurrence.
Notifiable incidents are reported to WorkSafe WA within the timeframes required by the WHS Act 2020 (WA) s.38. The incident scene is preserved for at least 24 hours or until an inspector releases it.
Nonconformity and Corrective Action
When a nonconformity is identified — through audits, incidents, client complaints, regulatory notices, or worker reports — Westlink takes action to control and correct it, evaluates the need for action to eliminate root causes, implements corrective actions, and reviews their effectiveness. The process is detailed in QHSE-PRO-004.
For service delivery nonconformities, the response includes client notification, containment of the nonconforming service, root cause analysis, and corrective action implementation. Records of nonconformities, actions taken, and effectiveness verification are retained.
Continual Improvement
Westlink continually improves the suitability, adequacy, and effectiveness of the WMS through:
-
Analysis of performance data and trends at management review
-
Internal audit findings and opportunities for improvement
-
Lessons learned from incidents and project completion reviews
-
Worker consultation and suggestions
-
Benchmarking against industry standards and client expectations
-
Adoption of improved technology, tools, and working methods
References
Standards
-
ISO 9001:2015 Quality Management Systems — Requirements
-
ISO 45001:2018 Occupational Health and Safety Management Systems — Requirements
-
ISO 14001:2026 Environmental Management Systems — Requirements
-
ISO 31000:2018 Risk Management — Guidelines
-
ISO 19011:2018 Guidelines for Auditing Management Systems
Legislation
-
Work Health and Safety Act 2020 (WA)
-
Work Health and Safety (General) Regulations 2022 (WA)
-
Environmental Protection Act 1986 (WA)
-
Dangerous Goods Safety Act 2004 (WA)
-
Road Traffic (Vehicles) Act 2012 (WA)
-
Workers’ Compensation and Injury Management Act 2023 (WA)
-
Fair Work Act 2009 (Cth)
-
Privacy Act 1988 (Cth)
-
Modern Slavery Act 2018 (Cth)
Defence and Security
-
Defence Industry Security Program (DISP) requirements
-
Information Security Manual (ISM) — June 2025
-
Protective Security Policy Framework (PSPF) 2025
-
JOSCAR pre-qualification requirements
Key Internal Documents
The complete WMS document register is maintained on SharePoint. Key procedures referenced in this manual include:
-
GOV-STD-001 — Document Management Standard
-
GOV-PRO-002 — Document Control Procedure
-
GOV-SCH-001 — Document Retention Schedule
-
QHSE-PRO-001 — Hazard and Incident Reporting and Investigation Procedure
-
QHSE-PRO-002 — Risk Management Procedure
-
QHSE-PRO-004 — Corrective Action Procedure
-
QHSE-PRO-007 — Emergency Preparedness and Response Procedure
-
QHSE-GDL-001 — Minimum HSES Requirements for Contractors
-
DEF-POL-001 — Defence Security Policy
-
TEC-POL-001 — Information Security Policy
Compliance coverage — cited by 293 requirements across 10 frameworks
Cyber Security Act 2024 (Cth)(1)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| CSA-RR-01 | Cyber Security Act 2024 s.26 (reporting business entity definition) | Partial | Low | §2.1Manual §2.1 identifies Westlink as an Australian entity. Annual turnover to be confirmed against $3M threshold each financial year. |
DSPF Principle 16 / Control 16.1 / Annex A(34)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| DSPF-C16.1-elig-01 | C16.1-elig-01 | Full | §1Manual §1 Purpose identifies Westlink Logistics Pty Ltd (ABN 25 058 919 305) as the legal entity. | |
| DSPF-C16.1-elig-02 | C16.1-elig-02 | Not Applicable | §1Manual does not attest solvency; ASIC extracts held in DISP project reference folder attest financial position. External-to-WMS evidence. | |
| DSPF-C16.1-elig-05 | C16.1-elig-05 | Partial | §11.3Manual §11.3 Defence and Security references DISP, ISM, PSPF, JOSCAR. Specific Annex A Entry Level standards established across four domains — see individual A16.1-entry-* rows below. | |
| DSPF-C16.1-ongoing-01 | C16.1-ongoing-01 | Partial | §11.3Manual §11.3 lists DISP, ISM, PSPF, JOSCAR as applicable; §6.1.3 Legal and Other Requirements includes Defence industry notifications in monitoring. | |
| DSPF-C16.1-ongoing-02 | C16.1-ongoing-02 | Partial | §10.1Manual §10.1 Incident Investigation addresses WHS/environmental incidents; §11.3 references DISP/ISM/PSPF. Defence security incident reporting path not documented in the WMS. | |
| DSPF-C16.1-ongoing-03 | C16.1-ongoing-03 | Full | §11.3Manual §11.3 references DISP obligations. | |
| DSPF-C16.1-ongoing-04 | C16.1-ongoing-04 | Partial | §6.3Manual §6.3 Management of Change addresses internal change process; explicit DISB notification trigger for change in circumstance not documented in WMS. DISP reference folder holds Completing-change-in-circumstance guide. | |
| DSPF-C16.1-ongoing-05 | C16.1-ongoing-05 | Partial | §9.3Manual §9.3 Internal Audit establishes auditing culture at WMS level; DISP-specific assurance (OSA, DDA, ASR) not separately documented as a recurring process. | |
| DSPF-C16.1-ongoing-06 | C16.1-ongoing-06 | Partial | §10.2Manual §10.2 Nonconformity and Corrective Action addresses corrective-action tracking generally; DISP-specific recommendation tracking not separately documented. | |
| DSPF-C16.1-cso-01 | C16.1-cso-01 | Full | §5.2Manual §5.2 organisational structure; CSO is an SES-level role per CEO direct reports. | |
| DSPF-C16.1-cso-02 | C16.1-cso-02 | Partial | §7.2Manual §7.2 Competence covers training generally; DISP-specific training cadence (every three years) not documented as a trigger in WMS. | |
| DSPF-C16.1-cso-03 | C16.1-cso-03 | Partial | §5.1Manual §5.1 Leadership and Commitment assigns CEO accountability for WMS; CSO-specific accountabilities (distinct from CEO) not enumerated in Manual or WMS policy suite. | |
| DSPF-C16.1-so-01 | C16.1-so-01 | Partial | §7.2.1Manual §7.2.1 Restricted Operations covers licences and certifications generally; Personnel Security Clearances for SO not separately documented. | |
| DSPF-C16.1-so-03 | C16.1-so-03 | Partial | §7.2Manual §7.2 Competence covers training; DISP-specific SO training cadence not separately tracked. | |
| DSPF-C16.1-so-04 | C16.1-so-04 | Partial | §5.2Manual §5.2 organisational responsibilities; SO-specific responsibilities not enumerated in WMS. | |
| DSPF-C16.1-so-05 | C16.1-so-05 | Partial | §6.3Manual §6.3 Management of Change addresses internal changes; DISP-specific 14-business-day CSO/SO change notification not documented as a trigger. | |
| DSPF-A16.1-all-01 | A16.1-all-01 | Partial | Medium | §11.3Manual §11.3 references DISP; aggregate requirement served by individual C16.1-* rows above. |
| DSPF-A16.1-all-02 | A16.1-all-02 | Partial | §11.3Manual §11.3 references DISP; demonstration via ASR and DISP documentation held in DISP project folder. | |
| DSPF-A16.1-all-03 | A16.1-all-03 | Full | §11.3Westlink holds Entry Level across all four domains — Governance ≥ max(other domains) satisfied. | |
| DSPF-A16.1-all-04 | A16.1-all-04 | Partial | §9.3Manual §9.3 Internal Audit establishes auditing discipline; DISP DDA/OSA engagement not documented as a commitment. | |
| DSPF-A16.1-entry-gov-01 | A16.1-entry-gov-01 | Full | §5.2Manual §5.2 organisational structure identifies both CSO and SO positions; acknowledgement letters on file. | |
| DSPF-A16.1-entry-gov-02 | A16.1-entry-gov-02 | Partial | §5.2Manual §5.2 organisational structure covers roles generally; DISP-specific security position designations not documented in WMS. DISP SGR in DISP project folder. | |
| DSPF-A16.1-entry-gov-03 | A16.1-entry-gov-03 | Partial | §6.1Manual §6.1 Risk-Based Approach covers WHS/quality/environmental risk; security-specific risk treatment not separately documented. DISP SRA exists in DISP project folder. | |
| DSPF-A16.1-entry-gov-04 | A16.1-entry-gov-04 | Full | §7.2Manual §7.2 Competence covers training generally; security-specific training not separately documented. | |
| DSPF-A16.1-entry-gov-09 | A16.1-entry-gov-09 | Partial | §9.3Manual §9.3 Internal Audit culture supports engagement; DISP assurance activities (ASR, training cadence, uplift) not separately tracked. | |
| DSPF-A16.1-entry-gov-cso-so-01 | A16.1-entry-gov-cso-so-01 | Partial | §7.2Manual §7.2 Competence covers training cadence generally; DISP SO training specifics not tracked as a controlled WMS training requirement. | |
| DSPF-A16.1-entry-gov-cso-so-02 | A16.1-entry-gov-cso-so-02 | Partial | §5.2Manual §5.2 organisational structure; specific OFFICIAL/OFFICIAL:Sensitive handling competency for CSO/SO not demonstrated via controlled WMS document. | |
| DSPF-A16.1-entry-pers-01 | A16.1-entry-pers-01 | Full | §7.2Manual §7.2 Competence covers pre-employment verification (CV, references, interview, qualification verification, pre-employment medical, right to work). | |
| DSPF-A16.1-entry-pers-02 | A16.1-entry-pers-02 | Partial | §7.2Manual §7.2 covers pre-employment, induction, ongoing development; separation procedures not explicitly documented. | |
| DSPF-A16.1-entry-pers-05 | A16.1-entry-pers-05 | Partial | §7.2Manual §7.2 covers workforce screening; HR-PRO-001 (live 09/06/2026) formalises the screening process for DISB provision. | |
| DSPF-A16.1-entry-pers-cso-so-01 | A16.1-entry-pers-cso-so-01 | Full | §5.2CSO/SO citizenship attested in disp-cso-acknowledgement-letter and disp-so-acknowledgement-letter (DISP project). | |
| DSPF-A16.1-entry-pers-cso-so-02 | A16.1-entry-pers-cso-so-02 | Partial | §7.2.1Restricted Operations section addresses licences/certifications; AGSVA Baseline clearance not separately documented in WMS. | |
| DSPF-A16.1-entry-phys-01 | A16.1-entry-phys-01 | Partial | §7.1Manual §7.1 Resources mentions infrastructure; physical security + access controls at facility level not separately documented in WMS controlled documents. | |
| DSPF-A16.1-entry-phys-02 | A16.1-entry-phys-02 | Partial | §2.3Manual §2.3 Sites and Operations identifies principal and regional sites; ownership/lease details not included in Manual. |
Heavy Vehicle National Law — Chain of Responsibility (off-road party scope)(2)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| HVNL-SYS-01 | HVNL s.26E + NHVR Master Code guidance | Full | §6.1WMS Manual §6.1 Risk and Opportunity Register — generic, does not segment CoR risks. §11.3 identifies HVNL/RT(V) Act as applicable legal requirements. | |
| HVNL-SYS-06 | HVNL s.26E (management review) | Partial | Medium | §9.3Management review clause present; CoR not explicitly listed as a standing input. |
ISO 14001:2026(74)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| ISO14001-2026-4.1-01 | 4.1 | Full | §4.1Manual §4.1 determines external issues (regulatory, defence, market, climate, supply chain) and internal issues (capability, complexity, technology, culture); reviewed at each management review. | |
| ISO14001-2026-4.1-02 | 4.1 | Full | §4.1.1Manual §4.1.1 External Issues explicitly lists climate change, decarbonisation policy, and biodiversity-related risks. 2026 cl 4.1 expands the 2015 wording to enumerate pollution levels, availability of natural resources, climate change, biodiversity and ecosystem health — all covered by the existing external-issues identification. | |
| ISO14001-2026-4.2-01 | 4.2 | Partial | §4.2Manual §4.2 states interested parties register maintained in management system platform and reviewed at each management review. 2026 cl 4.2 c) makes the conversion from need/expectation to compliance obligation explicit — Manual addresses via §6.1.3 legal register; register content not reproduced in Manual itself. | |
| ISO14001-2026-4.3-01 | 4.3 | Full | §2Manual §2 (Scope) defines IMS boundary (§2.1), services (§2.2), sites (§2.3), workforce (§2.4). | |
| ISO14001-2026-4.3-02 | 4.3 | Partial | §2Manual §2 defines scope; ISO 14001:2026 cl 4.3 a)-e) determination factors (issues, compliance obligations, organizational units/functions/physical boundaries, activities/products/services, authority and ability to exercise control or influence) not individually enumerated in scope statement. | |
| ISO14001-2026-4.3-03 | 4.3 | Full | §2.1Manual §2.1 Integrated Management System Boundary states the WMS covers all activities performed by Westlink Logistics Pty Ltd in the provision of specialised logistics services. §2.2 Services + §2.3 Sites + §2.4 Workforce enumerate inclusive coverage — satisfying 2026 cl 4.3 inclusivity requirement. | |
| ISO14001-2026-4.3-04 | 4.3 | Full | §2Manual §2 Scope is documented; Manual is available to interested parties per §5.3 ('available to interested parties on request'). 2026 wording 'available as documented information' aligns with how the scope is published. | |
| ISO14001-2026-4.4-01 | 4.4 | Full | §3Manual §3 Management System Overview describes the integrated EMS establishment, including document hierarchy, order of precedence, process model, and platform. Manual §3 + §Process Model satisfy the 2026 cl 4.4 establishment-of-EMS-with-processes-and-interactions requirement. | |
| ISO14001-2026-4.4-02 | 4.4 | Full | §1Manual §1 Purpose + §3 Management System Overview establish the integrated EMS considering context and interested parties. | |
| ISO14001-2026-5.1-01 | 5.1 | Full | §5.1Manual §5.1 Leadership and Commitment: CEO establishes policies, ensures WMS achieves intended outcomes, directs and supports personnel, promotes continual improvement. 2026 wording adds 'supporting other relevant roles to demonstrate leadership' — Manual §5.2 Organisational Structure shows distributed leadership through GM/Directors/Managers with documented IMS responsibilities. | |
| ISO14001-2026-5.2-01 | 5.2 | Full | §5.3Manual §5.3 Policy Framework confirms policy suite governance and CEO approval process. | |
| ISO14001-2026-5.3-01 | 5.3 | Full | §5.2Manual §5.2 embeds current organisational structure with IMS responsibilities per role; Schedule of Delegation defines authority limits. | |
| ISO14001-2026-5.3-02 | 5.3 | Full | §5.1Manual §5.1 assigns CEO accountability for WMS outcomes; GOV-POL-004 assigns QHSE Manager EMS implementation responsibility. ISO 5.3 a)–b) specific assignments (conformance + reporting performance) not individually enumerated beyond the QHSE Manager role. | |
| ISO14001-2026-6.1.1-01 | 6.1.1 | Full | §6.1Manual §6.1 Risk-Based Approach establishes processes aligned with ISO 31000 at strategic/operational/project levels. Manual references QHSE-PRO-002 Risk Management Procedure but that procedure is not yet in the WMS corpus (flagged in refresh log). | |
| ISO14001-2026-6.1.1-02 | 6.1.1 | Partial | §6.1Manual §6.1 Risk-Based Approach references the processes for hazard identification, environmental aspects (§6.1.2), legal requirements (§6.1.3), and management of change (§6.4 Management of Change). Process documentation lives in the isCompliant platform; Manual does not itemise each documented information artifact at the 6.1.2-6.1.5 level. | |
| ISO14001-2026-6.1.2-01 | 6.1.2 | Full | §6.1.2Manual §6.1.2 Environmental Aspects and Impacts explicit: aspects register maintained in management system platform, covers activities/products/services within defined scope. | |
| ISO14001-2026-6.1.2-02 | 6.1.2 | Full | §8.7Manual §8.7 Emergency Preparedness and Response identifies potential emergency situations including environmental ones (spills, dangerous goods incidents). Manual references QHSE-PRO-007 Emergency Preparedness and Response Procedure. 2026 cl 6.1.2 moves the emergency-situation determination from 2015 cl 6.1.1 to 6.1.2 — Manual coverage unchanged. | |
| ISO14001-2026-6.1.2-03 | 6.1.2 | Full | §6.1.2Manual §6.1.2 Environmental Aspects and Impacts addresses significant aspects (fuel/emissions, waste, spill risk, noise, heritage) and references the aspects register reviewed annually. 2026 cl 6.1.2 a) adds explicit consideration of 'normal and abnormal conditions' — the register methodology covers normal operations; abnormal conditions and emergencies are addressed via §8.7. The explicit normal/abnormal distinction is not separately documented in the Manual. | |
| ISO14001-2026-6.1.2-04 | 6.1.2 | Full | §6.1.2Manual §6.1.2 uses 'significance assessment methodology' to determine significant environmental aspects; reviewed annually. | |
| ISO14001-2026-6.1.2-05 | 6.1.2 | Partial | §7.3Manual §7.3 Awareness covers communication of environmental policy and relevant objectives to workers; specific communication of significant aspects 'among levels and functions' not explicit in the Manual. | |
| ISO14001-2026-6.1.2-06 | 6.1.2 | Full | §6.1.2Manual §6.1.2 states aspects register + significance criteria maintained in management system platform; reviewed annually. 2026 wording 'available as documented information' matches platform availability. | |
| ISO14001-2026-6.1.3-01 | 6.1.3 | Full | §6.1.3Manual §6.1.3 Legal and Other Requirements: legal register identifies applicable legislation, regulations, codes, standards, client contractual requirements; monitored through State Law Publisher, WorkSafe, Fair Work, ATO/ASIC, Defence, certification body communications. | |
| ISO14001-2026-6.1.3-02 | 6.1.3 | Full | §6.1.3Manual §6.1.3 Legal and Other Requirements states the legal register is maintained and monitored via State Law Publisher, WorkSafe WA, regulator bulletins. Platform-based documented information satisfies 2026 'available as documented information' wording. | |
| ISO14001-2026-6.1.4-01 | 6.1.4 | Partial | Medium | §6.1Manual §6.1 risk-based approach considers strategic, operational, and project levels — covering issues (§4.1), interested parties (§4.2), and the EMS scope. 2026 cl 6.1.4 (renumbered from 2015 cl 6.1.1) addresses identical planning-consideration content with explicit a)-d) list. |
| ISO14001-2026-6.1.4-02 | 6.1.4 | Partial | §6.1Risks and opportunities + process documentation referenced through the isCompliant platform. Manual does not itself itemise the documented information for risks and opportunities — register content lives in platform. | |
| ISO14001-2026-6.1.5-01 | 6.1.5 | Partial | §6.1Manual §6.1 risk-based approach addresses planning; 2026 cl 6.1.5 a)-b) specifics (take actions on aspects/obligations/risks, integrate into EMS processes, evaluate effectiveness) not individually enumerated. Manual addresses operationally via §8 Operations and §9 Performance Evaluation but specific 6.1.5 action-planning content is implicit. | |
| ISO14001-2026-6.2.1-01 | 6.2.1 | Full | §6.2Manual §6.2 establishes measurable environmental objectives set at management review, communicated, KPI-monitored. | |
| ISO14001-2026-6.2.1-02 | 6.2.1 | Full | §6.2Manual §6.2 Objectives addresses measurable + monitored + updated + maintained in platform. 2026 cl 6.2.1 e) updated-as-appropriate and f) available-as-documented-information are covered by 'Current objectives are maintained in the management system platform' — 6.2.1 a)-d) appropriateness/measurability/communication still partial at the Manual level (platform supplies specifics). | |
| ISO14001-2026-6.3-01 | 6.3 | Full | §Management of ChangeManual §6.4 Management of Change states: 'Changes to the WMS, operations, or organisational structure are managed through a structured process that identifies the change, assesses risks and impacts, plans implementation, communicates to affected parties, and verifies effectiveness. Changes that affect the scope or structure of the WMS are approved by the CEO.' This directly satisfies 2026 cl 6.3 first-sentence requirement that changes affecting the EMS are carried out in a planned manner. | |
| ISO14001-2026-6.3-02 | 6.3 | Full | §Management of ChangeManual §6.4 Management of Change ensures changes are managed via risk/impact assessment, implementation planning, communication, and effectiveness verification — fulfilling 2026 cl 6.3 second-sentence requirement that changes are managed to ensure intended outcomes are achieved. | |
| ISO14001-2026-7.1-01 | 7.1 | Full | §7.1Manual §7.1 Resources: CEO ensures adequate personnel, infrastructure (offices, IT, vehicles, equipment), work environment. | |
| ISO14001-2026-7.2-01 | 7.2 | Full | §7.2Manual §7.2 Competence: pre-employment verification, induction, ongoing development, prior learning; Restricted Operations (§7.2.1) require specific licences/tickets/certifications. ISO 14001 7.2 a)–d) addressed. | |
| ISO14001-2026-7.2-02 | 7.2 | Full | §7.3Manual §7.3: personnel files retain qualifications and certificates; training registers and competence records maintained. 2026 'available as documented information' wording matches retention pattern. | |
| ISO14001-2026-7.3-01 | 7.3 | Full | §7.3Manual §7.3 Awareness: workers aware of environmental policy, relevant objectives, their contribution, implications of nonconformance, lessons learned — delivered via induction, toolbox talks, pre-start meetings, platform. | |
| ISO14001-2026-7.4.1-01 | 7.4.1 | Full | §7.4Manual §7.4 Communication and Consultation: structured internal/external communication processes including worker consultation per WHS Act, client feedback. | |
| ISO14001-2026-7.4.1-02 | 7.4.1 | Partial | §7.4Manual §7.4 addresses communication structures; ISO 14001 7.4.1 specifics (consider compliance obligations, ensure environmental information reported is consistent with EMS information and reliable) not individually enumerated. | |
| ISO14001-2026-7.4.1-03 | 7.4.1 | Partial | §7.4Manual §7.4 mentions responding to client feedback; explicit 'respond to relevant communications on the EMS' not separately stated. | |
| ISO14001-2026-7.4.1-04 | 7.4.1 | Partial | §7.5Manual §7.5 Documented Information covers record retention generally; specific retention of communications as evidence not itemised. 2026 'available as evidence' equivalent in retention requirement. | |
| ISO14001-2026-7.4.2-01 | 7.4.2 | Partial | §7.4Manual §7.4: 'structured internal... communication processes'; also §7.3 awareness. ISO 14001 7.4.2 a)–b) (internal comms across levels, mechanism for workers to contribute to continual improvement) only partially addressed. | |
| ISO14001-2026-7.4.3-01 | 7.4.3 | Partial | §7.4Manual §7.4 mentions client/external feedback channels; ISO 14001 7.4.3 external communication of EMS information (including proactive reporting of environmental performance where required by compliance obligations) not separately documented. | |
| ISO14001-2026-7.5.1-01 | 7.5.1 | Full | §7.5Manual §7.5 Documented Information: EMS requires documented information created/updated/controlled per GOV-STD-001 and GOV-PRO-002. | |
| ISO14001-2026-7.5.2-01 | 7.5.2 | Full | §7.5Manual §7.5: approval, review, version control (SharePoint), classification, retention via GOV-SCH-001, accessibility — covers a)–c) creation/update requirements. | |
| ISO14001-2026-7.5.3-01 | 7.5.3 | Full | §7.5Manual §7.5: SharePoint version history, check-in/check-out, classification markings, accessibility at point of use, retention per GOV-SCH-001. 2026 wording introduces 'Documented information required by the environmental management system' as the controlled subject (vs 2015 noun ambiguity) — controls unchanged. | |
| ISO14001-2026-7.5.3-02 | 7.5.3 | Full | §7.5Manual §7.5 addresses distribution/access/retrieval (SharePoint), storage/preservation (platform), change control (GOV-PRO-002), retention/disposition (GOV-SCH-001). | |
| ISO14001-2026-8.1-01 | 8.1 | Full | §8.1Manual §8.1 Operational Planning and Control: plans, implements, controls operational processes considering client requirements, legislation, risk, resources, WHS hazards, environmental aspects. | |
| ISO14001-2026-8.1-02 | 8.1 | Full | §6.3Manual §6.3 Management of Change: identify change, assess risks/impacts, plan, communicate, verify effectiveness; unintended changes addressed through incident investigation / corrective action. | |
| ISO14001-2026-8.1-03 | 8.1 | Full | §Supplier and Subcontractor ManagementManual §8.3 Supplier and Subcontractor Management: tiered prequalification (GOV-PRO-003/005), contractor WHS requirements (QHSE-GDL-001), performance monitoring (three-deficiency reassessment trigger). 2026 cl 8.1 broadens 'outsourced processes' to 'externally provided processes, products or services that are relevant to the intended outcomes' — Manual coverage applies to all three categories. | |
| ISO14001-2026-8.1-04 | 8.1 | Full | §8.3Manual §8.3 defines control/influence tiers (major vs minor suppliers) but does not explicitly link tier choice to environmental-aspect impact. | |
| ISO14001-2026-8.1-05 | 8.1 | Full | §Life Cycle PerspectiveManual §8 Life Cycle Perspective subsection (Rev 9, 2026-05-11) covers acquisition (fleet/plant specifications, supplier flow-down via GOV-PRO-003/005), service design (route/modal/load planning, client requirement reviews), use (operational controls), maintenance (planned maintenance regimes with environmental considerations), end-of-life (licensed recyclers, disposal records linked to aspects register and GOV-SCH-001), and external communication (cl 8.1 d) — environmental requirements to subcontractors and clients). | |
| ISO14001-2026-8.1-06 | 8.1 | Full | §7.5Manual §7.5 documented information retention; §8.1 operational planning records; isCompliant platform audit trail. 2026 'available as documented information' aligns with platform-based retention. | |
| ISO14001-2026-8.2-01 | 8.2 | Full | §8.7Manual §8.7 Emergency Preparedness and Response: emergency response plans for each operational site/project, trained first aiders/wardens, drills/exercises, communication protocols, post-incident review. QHSE-PRO-007 (referenced in Manual) not yet in WMS corpus. | |
| ISO14001-2026-8.2-02 | 8.2 | Full | §Environmental Operational ControlsManual §8.6 includes spill prevention and response (kits on all vehicles/worksites, spill response training, containment procedures). | |
| ISO14001-2026-8.2-03 | 8.2 | Partial | §8.7Manual §8.7 post-incident review and plan updates imply documented information retention; specific documented information requirement for emergency-preparedness processes addressed via QHSE-PRO-007 (not yet in WMS corpus). | |
| ISO14001-2026-9.1.1-01 | 9.1.1 | Full | §9.4Manual §9.4 Management Review explicitly assesses continuing suitability, adequacy, and effectiveness of the WMS. | |
| ISO14001-2026-9.1.1-02 | 9.1.1 | Full | §9.1Manual §9.1 restates determination intent; ISO 14001 9.1.1 a)–d) specifics (what, methods, criteria, analysis/evaluation timing) not individually documented in Manual — platform-held. | |
| ISO14001-2026-9.1.1-03 | 9.1.1 | Full | §Calibrated and Verified Monitoring EquipmentManual §9 Calibrated and Verified Monitoring Equipment subsection (Rev 9, 2026-05-11) with equipment register covering fuel flow meters/telematics, noise meters, weighbridges and load cells, spill volume measurement, and gas detectors. Specifies verification method (OEM certificate, field calibrator, NMI-traceable verification, bump test) and frequency (pre-use, 6-monthly, annual). Out-of-calibration equipment removed from service and validity of previous measurements assessed; calibration records retained per GOV-SCH-001. | |
| ISO14001-2026-9.1.1-04 | 9.1.1 | Partial | §7.4Manual §7.4 internal/external communication processes; ISO 14001 9.1.1 explicit requirement to communicate environmental performance information both internally and externally not separately documented. | |
| ISO14001-2026-9.1.1-05 | 9.1.1 | Full | §7.5Manual §7.5 documented information retention + §9.4 management review records retained in platform. 2026 'available as evidence' wording matches retention pattern. | |
| ISO14001-2026-9.1.2-01 | 9.1.2 | Partial | §6.1.3Manual §6.1.3 states 'Compliance is evaluated periodically as described in the performance evaluation section' but no dedicated compliance-evaluation process is documented at the Manual level. 2026 wording change ('evaluate if it is meeting its compliance obligations' vs 'evaluate fulfilment') is substantive in intent but evidence position unchanged. | |
| ISO14001-2026-9.1.2-02 | 9.1.2 | Partial | §9.3Manual §9.3 Internal Audit covers conformity-to-WMS-requirements audits at planned intervals; ISO 14001 9.1.2 a)–c) specific compliance evaluation process (frequency, evaluate, take action, maintain knowledge of status) not separately documented. | |
| ISO14001-2026-9.1.2-03 | 9.1.2 | Partial | §7.5Manual §7.5 retention general; compliance evaluation records as a distinct record type not specified. | |
| ISO14001-2026-9.2.1-01 | 9.2.1 | Full | §9.3Manual §9.3 Internal Audit: audits at planned intervals verify conformity to ISO 9001/45001/14001 and WMS requirements. | |
| ISO14001-2026-9.2.2-01 | 9.2.2 | Full | §9.3Manual §9.3: audit frequency (at least annually per process + trigger-based), auditor competence and independence, findings classified and tracked through corrective action. | |
| ISO14001-2026-9.2.2-02 | 9.2.2 | Full | §9.3Manual §9.3: audit programme considers process importance, changes affecting the organisation, prior audit results. | |
| ISO14001-2026-9.2.2-03 | 9.2.2 | Partial | Medium | §9.3Manual §9.3: auditors independent of the activity being audited, trained in audit techniques. 2026 cl 9.2.2 c) adds 'audit objective(s)' alongside criteria and scope — Manual §9.3 audit-programme references implicitly include objectives via the audit-programme planning step. |
| ISO14001-2026-9.2.2-04 | 9.2.2 | Full | §9.3Manual §9.3: findings tracked through corrective action process; retention implied via platform. 2026 cl 9.2.2 d) consolidates audit-programme + implementation + audit-results documentation under 'available' wording. | |
| ISO14001-2026-9.3.1-01 | 9.3.1 | Full | §9.4Manual §9.4: 'CEO chairs an annual management review to assess the continuing suitability, adequacy, and effectiveness of the WMS.' EMS is an integrated part of WMS. | |
| ISO14001-2026-9.3.2-01 | 9.3.2 | Full | §9.4.1Manual §9.4.1 Management Review Inputs cover: status of prior actions, external/internal issue changes, EMS performance data, nonconformities, audit results, compliance evaluation, client satisfaction, resources, risk/opportunity effectiveness, improvement opportunities — aligned with ISO 14001 9.3 a)–g). | |
| ISO14001-2026-9.3.3-01 | 9.3.3 | Partial | Medium | §9.4.2Manual §9.4.2 Outputs: continual improvement decisions, WMS changes, resource requirements, updated objectives/targets for next period. |
| ISO14001-2026-9.3.3-02 | 9.3.3 | Full | §9.4Manual §9.4: 'Management review records are retained in the management system platform.' 2026 cl 9.3 subdivision (9.3.1 General / 9.3.2 Inputs / 9.3.3 Outputs) does not change evidence position — review records retention is unchanged. | |
| ISO14001-2026-10.1-01 | 10.1 | Full | §Continual ImprovementManual §10.3 Continual Improvement identifies improvement opportunities via performance analysis, audit findings, lessons learned, worker consultation, and management review. 2026 cl 10.1 merges 2015 cl 10.1 (General — opportunity determination) and 2015 cl 10.3 (Continual improvement) into a single requirement — Manual content covers both. | |
| ISO14001-2026-10.2-01 | 10.2 | Full | §10.1Manual §10.1 Incident Investigation: all incidents/near misses/hazards reported and investigated per QHSE-PRO-001; investigation identifies root causes and determines corrective actions. | |
| ISO14001-2026-10.2-02 | 10.2 | Partial | §10.1Manual §10.1: 'Investigation depth is proportionate to the actual or potential severity of the event' — proportionality covered in investigation sense; 'corrective actions appropriate to significance of environmental impact(s)' not explicitly worded. | |
| ISO14001-2026-10.2-03 | 10.2 | Full | §10.2Manual §10.2: records of nonconformities, actions taken, and effectiveness verification are retained. 2026 wording 'available as evidence of' matches retention pattern. |
ISO 45001:2018(84)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| ISO45001-2018-4.1-01 | 4.1 | Full | §4.1Manual §4.1 determines external + internal issues; §4.1.1 includes WHS regulatory (WA + Cth), defence requirements, market, climate/environmental, supply chain; §4.1.2 includes workforce competence, operational complexity, technology, safety culture. | |
| ISO45001-2018-4.2-01 | 4.2 | Full | §2.4Manual §2.4 Workforce: WMS applies to all workers as defined by WHS Act 2020 (WA) — employees, contractors, subcontractors, labour hire, volunteers, visitors. | |
| ISO45001-2018-4.3-01 | 4.3 | Full | §2Manual §2 (Scope) defines IMS boundary (§2.1), services (§2.2), sites (§2.3), workforce (§2.4). | |
| ISO45001-2018-4.3-02 | 4.3 | Partial | §2Manual §2 defines scope; ISO 45001 4.3 a)–c) determination factors (issues, requirements, work-related activities) not individually enumerated. | |
| ISO45001-2018-4.3-03 | 4.3 | Full | §2.4Manual §2.4 extends WMS applicability to all workers under organisation's control per WHS Act definition. | |
| ISO45001-2018-4.3-04 | 4.3 | Full | §2Manual §2 Scope is documented; Manual available to interested parties on request (§5.3). | |
| ISO45001-2018-4.4-01 | 4.4 | Full | §1Manual §1 Purpose + §3 Management System Overview establish integrated OH&S MS including processes and interactions via PDCA cycle (§3.3). | |
| ISO45001-2018-5.1-01 | 5.1 | Partial | §5.1Manual §5.1 Leadership and Commitment: CEO takes accountability, ensures WMS intended outcomes, directs/supports persons, promotes continual improvement, ensures adequate resources. Stop-work authority granted to all personnel including subcontractors/visitors without fear of reprisal. ISO 45001 5.1 a)–m) substantively addressed. | |
| ISO45001-2018-5.2-01 | 5.2 | Full | §5.3Manual §5.3 Policy Framework confirms policy suite governance. | |
| ISO45001-2018-5.3-01 | 5.3 | Full | §5.2Manual §5.2 embeds current organisational structure with IMS responsibilities per role; Schedule of Delegation defines authority limits. Roles communicated via Manual and maintained as documented information. | |
| ISO45001-2018-5.3-02 | 5.3 | Partial | §5.1Manual §5.1 grants stop-work authority to all personnel without reprisal — implies workers at each level assume responsibility for OH&S aspects under their control. ISO 45001 5.3 explicit 'workers at each level shall assume responsibility' not stated verbatim. | |
| ISO45001-2018-5.3-03 | 5.3 | Partial | §5.1Manual §5.1 CEO accountability for WMS intended outcomes; reporting to top management implicit via §9.4 Management Review. ISO 45001 5.3 a)–b) specific assignment of conformance + performance-reporting responsibility not individually enumerated. | |
| ISO45001-2018-5.4-01 | 5.4 | Partial | §7.4Manual §7.4: 'Worker consultation on WHS matters is a legislative requirement under the WHS Act 2020 (WA) and a core element of the WMS.' | |
| ISO45001-2018-5.4-02 | 5.4 | Partial | §7.4Manual §7.4 structured internal/external communication processes including worker consultation per WHS Act. | |
| ISO45001-2018-6.1.1-01 | 6.1.1 | Full | §6.1Manual §6.1 Risk-Based Approach: risks identified/assessed/treated at strategic/operational/project levels considering issues (§4.1), interested parties (§4.2), scope (§2). | |
| ISO45001-2018-6.1.1-02 | 6.1.1 | Partial | §6.1Manual §6.1 risk-based approach determines risks and opportunities; ISO 45001 6.1.1 considerations a)–c) (hazards, compliance obligations, risks/opportunities) not individually enumerated. QHSE-PRO-002 Risk Management Procedure (referenced in Manual) not yet in WMS corpus. | |
| ISO45001-2018-6.1.1-03 | 6.1.1 | Partial | §6.1Manual §6.1 addresses planning processes at strategic/operational/project level; ISO 45001 6.1.1 explicit determination + assessment of risks and opportunities relevant to intended outcomes not enumerated. QHSE-PRO-002 not yet in corpus. | |
| ISO45001-2018-6.1.1-04 | 6.1.1 | Full | §6.3Manual §6.3 Management of Change: change identified, risks/impacts assessed, implementation planned, communicated, effectiveness verified — before change is implemented. | |
| ISO45001-2018-6.1.1-05 | 6.1.1 | Partial | §6.1Documented information on risks/opportunities maintained in isCompliant platform registers; Manual does not itself itemise the ISO 45001 6.1.1 bullet list of required documented information. | |
| ISO45001-2018-6.1.2.1-01 | 6.1.2.1 | Full | §6.1.1Manual §6.1.1 Hazard Identification and WHS Risk: proactive identification via workplace inspections, JHAs, SWMS, pre-start meetings, worker consultation. Ongoing and proactive pattern explicit. | |
| ISO45001-2018-6.1.2.1-02 | 6.1.2.1 | Partial | §6.1.1Manual §6.1.1 hazard ID methods cover some a)–f) categories (past incidents via QHSE-PRO-001, emergency via §8.7, workers/contractors via §2.4, routine/non-routine via JHA distinction). Work organisation / social factors / psychosocial hazards not explicitly listed as hazard sources. | |
| ISO45001-2018-6.1.2.2-01 | 6.1.2.2 | Partial | §6.1.1Manual §6.1.1 applies hierarchy of controls to hazard treatments (assessment implied); ISO 45001 6.1.2.2 a)–b) explicit methodology + criteria for assessing OH&S risks and other risks not documented in Manual. | |
| ISO45001-2018-6.1.2.2-02 | 6.1.2.2 | Partial | §6.1Manual §6.1 references QHSE-PRO-002 Risk Management Procedure for methodology/criteria detail; procedure not yet in WMS corpus. Manual alone does not define assessment methodology scope/nature/timing. | |
| ISO45001-2018-6.1.2.2-03 | 6.1.2.2 | Partial | §7.5Manual §7.5 covers documented information retention; methodology/criteria as distinct documented information not explicitly specified. | |
| ISO45001-2018-6.1.2.3-01 | 6.1.2.3 | Partial | §6.1Manual §6.1 risk-based approach references 'risks and opportunities' but process for assessing OH&S opportunities distinctly (to enhance performance, adapt to change, ergonomic/injury reduction options) not documented. | |
| ISO45001-2018-6.1.3-01 | 6.1.3 | Full | §6.1.3Manual §6.1.3 Legal and Other Requirements: legal register identifies legislation/regulations/codes of practice/standards/client contractual requirements; monitored via State Law Publisher, WorkSafe WA newsletters, Fair Work, ATO/ASIC, Defence, certification bodies. | |
| ISO45001-2018-6.1.3-02 | 6.1.3 | Full | §6.1.3Manual §6.1.3 states legal register maintained; updates via regulator subscriptions ensure currency. | |
| ISO45001-2018-6.1.4-01 | 6.1.4 | Partial | §6.1Manual §6.1 risk-based approach addresses planning; ISO 45001 6.1.4 a)–b) (plan actions for risks/opps/legal/emergency + integrate into MS + evaluate effectiveness) not individually enumerated. | |
| ISO45001-2018-6.1.4-02 | 6.1.4 | Full | §6.1.1Manual §6.1.1 explicitly applies hierarchy of controls (elimination, substitution, isolation, engineering, administrative, PPE) to all hazard treatments. | |
| ISO45001-2018-6.1.4-03 | 6.1.4 | Partial | §6.1Manual §6.1 references proportional risk treatment; explicit consideration of best practices + technological options + financial/operational/business requirements not enumerated. | |
| ISO45001-2018-6.2.1-01 | 6.2.1 | Full | §6.2Manual §6.2 establishes measurable OH&S objectives at management review; communicated to relevant personnel; KPI-monitored. | |
| ISO45001-2018-6.2.1-02 | 6.2.1 | Partial | §6.2Manual §6.2 addresses measurable + monitored + updated; ISO 45001 6.2.1 a)–g) (consistent with policy, measurable, monitored, communicated, updated, consideration of requirements, hazard/risk assessment results, consultation results) not all individually enumerated. | |
| ISO45001-2018-6.2.2-01 | 6.2.2 | Partial | §6.2Manual §6.2 mentions objectives set and monitored; ISO 45001 6.2.2 a)–f) plan-to-achieve elements (what, resources, responsible, completion, evaluation method/indicator, integration into business) not documented. | |
| ISO45001-2018-6.2.2-02 | 6.2.2 | Full | §6.2Manual §6.2: 'Current objectives are maintained in the management system platform' — documented information on objectives and plans retained. | |
| ISO45001-2018-7.1-01 | 7.1 | Full | §7.1Manual §7.1 Resources: CEO ensures adequate personnel, infrastructure, work environment for WMS implementation and continual improvement. | |
| ISO45001-2018-7.2-01 | 7.2 | Full | §7.2Manual §7.2 Competence: pre-employment verification, induction, ongoing development, prior learning; Restricted Operations (§7.2.1) require verified current licences/tickets/certifications. ISO 45001 7.2 a)–d) substantively addressed. | |
| ISO45001-2018-7.3-01 | 7.3 | Full | §7.3Manual §7.3 Awareness: workers aware of OH&S policy, objectives, contribution to effectiveness, implications of nonconformance, incidents + lessons learned — via induction, toolbox talks, pre-start meetings, platform. | |
| ISO45001-2018-7.4.1-01 | 7.4.1 | Full | §7.4Manual §7.4 Communication and Consultation: structured internal/external communication processes relevant to the OH&S MS. | |
| ISO45001-2018-7.4.1-02 | 7.4.1 | Partial | §7.4Manual §7.4 addresses communication structures but does not explicitly address diversity aspects (gender, language, culture, literacy, disability) in determining how to communicate. | |
| ISO45001-2018-7.4.1-03 | 7.4.1 | Partial | §7.4Manual §7.4 mentions client feedback and formal feedback records; ISO 45001 explicit requirement to ensure external interested parties' views are considered in establishing comm process not separately documented. | |
| ISO45001-2018-7.4.1-04 | 7.4.1 | Partial | §7.4Manual §7.4 general communication processes; ISO 45001 7.4.1 considerations (legal requirements, consistency with MS info, accuracy/reliability of environmental info) not itemised. | |
| ISO45001-2018-7.4.1-05 | 7.4.1 | Partial | §7.4Manual §7.4 mentions responding to client feedback; explicit 'respond to relevant communications on OH&S MS' not separately stated. | |
| ISO45001-2018-7.4.1-06 | 7.4.1 | Partial | §7.5Manual §7.5 documented information retention general; specific retention of communications as evidence not itemised. | |
| ISO45001-2018-7.4.2-01 | 7.4.2 | Partial | §7.4Manual §7.4 internal communication structures; ISO 45001 7.4.2 a)–b) specifics (internal comms across levels/functions, mechanism enabling worker contribution to continual improvement) partially addressed via consultation + platform; full enumeration not documented. | |
| ISO45001-2018-7.4.3-01 | 7.4.3 | Partial | §7.4Manual §7.4 mentions external communication channels; 45001 7.4.3 external OH&S information communication (including where required by compliance obligations) not separately documented. | |
| ISO45001-2018-7.5.1-01 | 7.5.1 | Full | §7.5Manual §7.5 Documented Information: OH&S MS requires documented information created/updated/controlled per GOV-STD-001 and GOV-PRO-002. | |
| ISO45001-2018-7.5.2-01 | 7.5.2 | Full | §7.5Manual §7.5: approval, review, version control, classification, retention, accessibility — covers a)–c) creation/update requirements. | |
| ISO45001-2018-7.5.3-01 | 7.5.3 | Full | §7.5Manual §7.5: SharePoint version history, check-in/check-out, classification markings, accessibility at point of use, retention per GOV-SCH-001. | |
| ISO45001-2018-7.5.3-02 | 7.5.3 | Full | §7.5Manual §7.5 addresses distribution/access/retrieval (SharePoint), storage/preservation (platform), change control (GOV-PRO-002), retention/disposition (GOV-SCH-001). | |
| ISO45001-2018-7.5.3-03 | 7.5.3 | Partial | §7.5Manual §7.5 addresses documented information of internal origin; specific treatment of external-origin documents (e.g. client contract specs, regulator guidance, legal texts) not separately enumerated. | |
| ISO45001-2018-8.1.1-01 | 8.1.1 | Full | §8.1Manual §8.1 Operational Planning and Control: plans, implements, controls operational processes considering client requirements, legislation, risk, resources, WHS hazards, environmental aspects. | |
| ISO45001-2018-8.1.1-02 | 8.1.1 | Partial | §8.3Manual §8.3 Supplier and Subcontractor Management + QHSE-GDL-001 Minimum HSES Requirements for Contractors establish control/influence over contractors. 45001 8.1.1 explicit 'coordinate relevant parts of OH&S MS at multi-employer workplaces' not documented as a specific process. | |
| ISO45001-2018-8.1.2-01 | 8.1.2 | Full | §6.1.1Manual §6.1.1 explicitly applies hierarchy of controls: elimination, substitution, isolation, engineering, administrative, PPE — to all hazard treatments. | |
| ISO45001-2018-8.1.3-01 | 8.1.3 | Full | §6.3Manual §6.3 Management of Change: identifies change, assesses risks/impacts, plans implementation, communicates, verifies effectiveness. Changes affecting WMS scope CEO-approved. | |
| ISO45001-2018-8.1.3-02 | 8.1.3 | Partial | §6.3Manual §6.3 addresses planned changes; unintended changes addressed implicitly via incident investigation/CA but not stated as an explicit MoC consequence-review requirement. | |
| ISO45001-2018-8.1.4.1-01 | 8.1.4.1 | Full | §8.3Manual §8.3 Supplier and Subcontractor Management: tiered prequalification (GOV-PRO-003/005 — not yet in corpus), performance monitoring, WHS/environmental/quality capability assessment. | |
| ISO45001-2018-8.1.4.2-01 | 8.1.4.2 | Full | §8.3Manual §8.3: contractor WHS requirements coordinated via QHSE-GDL-001 (Minimum HSES Requirements for Contractors, referenced in Manual but not yet in corpus). Major supplier prequalification includes WHS capability assessment per GOV-PRO-003 (also not yet in corpus). | |
| ISO45001-2018-8.1.4.2-02 | 8.1.4.2 | Full | §8.3Manual §8.3: 'Contractor WHS requirements are specified in QHSE-GDL-001 (Minimum HSES Requirements for Contractors)'. | |
| ISO45001-2018-8.1.4.2-03 | 8.1.4.2 | Full | §8.3Manual §8.3: tiered prequalification includes WHS capability assessment; three deficiency instances in rolling 6-month period trigger reassessment. | |
| ISO45001-2018-8.1.4.3-01 | 8.1.4.3 | Full | §8.3Manual §8.3 addresses external provider control; 45001 8.1.4.3 'outsourced functions/processes' not separately defined from supplier/contractor categories. | |
| ISO45001-2018-8.1.4.3-02 | 8.1.4.3 | Partial | §8.3Manual §8.3 addresses supplier control within WMS; explicit consistency of outsourcing arrangements with legal requirements and intended OH&S MS outcomes not separately stated. | |
| ISO45001-2018-8.1.4.3-03 | 8.1.4.3 | Full | §8.3Manual §8.3 defines tier-based control (major vs minor suppliers); explicit definition of type/degree of control for outsourced functions within OH&S MS not documented. | |
| ISO45001-2018-8.2-01 | 8.2 | Full | §8.7Manual §8.7 Emergency Preparedness and Response: emergency response plans for each operational site/project, trained first aiders/wardens, drills/exercises, communication protocols, post-incident review. QHSE-PRO-007 referenced (not yet in WMS corpus). | |
| ISO45001-2018-8.2-02 | 8.2 | Partial | §8.7Manual §8.7 describes emergency process elements but specific documented-information retention for the process and for response plans not itemised. QHSE-PRO-007 (where retention specifics would typically sit) not yet in corpus. | |
| ISO45001-2018-9.1.1-01 | 9.1.1 | Full | §9.1Manual §9.1 Monitoring, Measurement, and Analysis: Westlink determines what, methods, when, and analysis timing — including OH&S performance. | |
| ISO45001-2018-9.1.1-02 | 9.1.1 | Partial | §9.1Manual §9.1 states determination intent; ISO 45001 9.1.1 a)–d) specifics (what to monitor including legal compliance + hierarchy + workers exposure + methods/criteria/when) not individually documented — platform-held. QHSE-MAN-001 §9.5 Health Surveillance covers worker exposure monitoring. | |
| ISO45001-2018-9.1.1-03 | 9.1.1 | Full | §9.4Manual §9.4 Management Review explicitly assesses continuing suitability, adequacy, and effectiveness of the WMS — OH&S MS is an integrated element. | |
| ISO45001-2018-9.1.1-05 | 9.1.1 | Full | §7.5Manual §7.5 documented information retention + §9.4 review records retained in platform + §7.3 training/competence records. | |
| ISO45001-2018-9.1.2-01 | 9.1.2 | Partial | §6.1.3Manual §6.1.3: 'Compliance is evaluated periodically as described in the performance evaluation section' — referenced but no dedicated compliance-evaluation process documented in §9. Reliance on internal audit + management review. | |
| ISO45001-2018-9.1.2-02 | 9.1.2 | Partial | §9.3Manual §9.3 Internal Audit covers WMS-conformity audits; ISO 45001 9.1.2 a)–e) specifics (frequency, evaluate, take action, maintain knowledge, retain documented info) not separately documented. | |
| ISO45001-2018-9.2.1-01 | 9.2.1 | Full | §9.3Manual §9.3 Internal Audit: audits at planned intervals verify conformity to ISO 9001/45001/14001 and WMS requirements; considers process importance, changes, prior audit results. | |
| ISO45001-2018-9.2.2-01 | 9.2.2 | Full | §9.3Manual §9.3: audit programme with frequency (at least annually per process + trigger-based), methods, responsibilities, planning, reporting; auditor competence + independence; findings classified (NCR/observation/OFI) + tracked through corrective action; documented information retained. | |
| ISO45001-2018-9.3-01 | 9.3 | Full | §9.4Manual §9.4: 'CEO chairs an annual management review to assess the continuing suitability, adequacy, and effectiveness of the WMS' — OH&S MS is integrated. | |
| ISO45001-2018-9.3-02 | 9.3 | Full | §9.4.1Manual §9.4.1 Management Review Inputs cover prior actions, external/internal issue changes, performance data (quality/WHS/environmental KPIs, NCs, audit results, compliance), client satisfaction, resources, risk/opportunity effectiveness, improvement opportunities. ISO 45001 9.3 input items specific to OH&S — consultation + participation results, incidents + hazards + trends, risks/opps relevant to OH&S MS — not individually listed. | |
| ISO45001-2018-9.3-03 | 9.3 | Full | §9.4.2Manual §9.4.2 Management Review Outputs: decisions on continual improvement, WMS changes, resource requirements, updated objectives/targets — aligned with ISO 45001 9.3 output categories. | |
| ISO45001-2018-9.3-04 | 9.3 | Partial | §7.4Manual §7.4 general internal communication; ISO 45001 9.3 explicit requirement to communicate management review outputs to workers (and workers' representatives where they exist) not separately documented. | |
| ISO45001-2018-9.3-05 | 9.3 | Full | §9.4Manual §9.4: 'Management review records are retained in the management system platform.' | |
| ISO45001-2018-10.1-01 | 10.1 | Full | §10.3Manual §10.3 Continual Improvement: identifies opportunities via performance analysis, audit findings, lessons learned, worker consultation, benchmarking, technology adoption. | |
| ISO45001-2018-10.2-01 | 10.2 | Full | §10.1Manual §10.1 Incident Investigation: all incidents/near misses/hazards reported and investigated per QHSE-PRO-001; investigation depth proportionate to severity; identifies root causes; determines corrective actions. | |
| ISO45001-2018-10.2-02 | 10.2 | Full | §10.1Manual §10.1 addresses timely reaction to incidents (notifiable incidents reported within WHS Act timeframes, scene preservation for ≥24h). §10.2 addresses control/correct + root cause + CA + effectiveness review. | |
| ISO45001-2018-10.2-03 | 10.2 | Partial | §10.1Manual §10.1: 'Investigation depth is proportionate to the actual or potential severity of the event' — proportionality covered in investigation sense; explicit wording on CA being appropriate to effects/potential effects of incidents/NCs not verbatim. | |
| ISO45001-2018-10.2-04 | 10.2 | Full | §10.2Manual §10.2: 'Records of nonconformities, actions taken, and effectiveness verification are retained' — covers ISO 45001 10.2 retained documented info on nature + actions + results. | |
| ISO45001-2018-10.2-05 | 10.2 | Partial | §7.4Manual §7.4 general communication; ISO 45001 10.2 specific requirement to communicate documented incident/NC information to relevant workers, workers' representatives, and other interested parties not separately documented. | |
| ISO45001-2018-10.3-01 | 10.3 | Full | §10.3Manual §10.3: continual improvement through performance analysis, audit findings, lessons learned, worker consultation, benchmarking, technology adoption. |
ISO 9001:2015(78)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| ISO9001-2015-4.1-01 | 4.1 | Full | §4.1Manual §4.1 determines external (4.1.1) and internal (4.1.2) issues; reviewed at each management review and updated on significant change. | |
| ISO9001-2015-4.1-02 | 4.1 | Full | §4.1Manual §4.1 states context analysis reviewed at each management review and updated when significant changes occur. | |
| ISO9001-2015-4.2-01 | 4.2 | Full | WMS Manual — interested parties section. | |
| ISO9001-2015-4.2-02 | 4.2 | Partial | Medium | WMS Manual — interested parties section. |
| ISO9001-2015-4.3-01 | 4.3 | Full | §ScopeManual defines QMS scope. | |
| ISO9001-2015-4.3-02 | 4.3 | Full | §ScopeManual defines QMS scope. | |
| ISO9001-2015-4.3-03 | 4.3 | Full | §ScopeManual defines QMS scope. | |
| ISO9001-2015-4.3-04 | 4.3 | Full | §ScopeManual defines QMS scope. | |
| ISO9001-2015-4.3-05 | 4.3 | Full | §ScopeManual defines QMS scope. | |
| ISO9001-2015-4.4.1-01 | 4.4.1 | Partial | Medium | §3.3Manual §3.3 Process Model covers PDCA process interactions at a summary level; ISO a)–h) enumeration (inputs/outputs, sequence, criteria/indicators, resources, responsibilities, risks, evaluation, improvement) not all explicit in Manual — supporting procedures carry the detail. |
| ISO9001-2015-4.4.2-01 | 4.4.2 | Full | §7.5Manual §7.5 Documented Information covers creation, approval, review, version control, classification, retention, accessibility — all per GOV-STD-001 and GOV-PRO-002. | |
| ISO9001-2015-5.1.1-01 | 5.1.1 | Partial | Low | WMS Manual — leadership responsibilities. |
| ISO9001-2015-5.1.2-01 | 5.1.2 | Partial | Low | |
| ISO9001-2015-5.2.2-01 | 5.2.2 | Partial | Manual documents policy communication. | |
| ISO9001-2015-5.3-01 | 5.3 | Full | §5.2Manual §5.2 embeds current Westlink organisational structure with IMS responsibilities per role; Schedule of Delegation defines authority limits. | |
| ISO9001-2015-5.3-02 | 5.3 | Partial | Low | §5.1Manual §5.1 assigns CEO accountability for WMS intended outcomes; ISO 5.3 a)–e) specific assignments (conformance, outputs, customer focus promotion, integrity during change, reporting to top management) not individually enumerated in the Manual. |
| ISO9001-2015-6.1.1-01 | 6.1.1 | Partial | High | Risks and opportunities section. |
| ISO9001-2015-6.1.2-01 | 6.1.2 | Partial | High | §6.1Manual §6.1 states risk-based approach aligned with ISO 31000 applied at strategic/operational/project levels; ISO 6.1.2 a)–b) integration/evaluation/effectiveness loop details are in QHSE-PRO-002 (referenced). |
| ISO9001-2015-6.1.2-02 | 6.1.2 | Partial | High | §6.1Manual §6.1 describes risk-based approach but proportionality principle ('proportionate to potential impact') not explicitly stated — relies on QHSE-PRO-002 Risk Management Procedure. |
| ISO9001-2015-6.2.1-01 | 6.2.1 | Full | §6.2Manual §6.2 establishes measurable objectives for quality, WHS, environmental performance set at management review, communicated, KPI-monitored. | |
| ISO9001-2015-6.2.1-02 | 6.2.1 | Partial | Medium | §6.2Manual §6.2 addresses measurable/monitored/updated; ISO 6.2.1 a)–g) not all explicit — consistency with quality policy, relevance to conformity and customer satisfaction, and communication not individually enumerated. |
| ISO9001-2015-6.2.1-03 | 6.2.1 | Full | §6.2Manual §6.2: 'Current objectives are maintained in the management system platform' — authoritative documented information. | |
| ISO9001-2015-6.2.2-01 | 6.2.2 | Partial | Medium | §6.2Manual §6.2 mentions monitoring and updating but ISO 6.2.2 a)–e) plan-to-achieve elements (what, resources, responsible, completion date, evaluation method) not all documented in the Manual. |
| ISO9001-2015-6.3-01 | 6.3 | Full | ||
| ISO9001-2015-6.3-02 | 6.3 | Partial | Medium | |
| ISO9001-2015-7.1.1-01 | 7.1.1 | Full | §7.1Manual §7.1: 'CEO ensures adequate resources for WMS implementation and continual improvement — personnel, infrastructure (offices, IT, vehicles, equipment), and work environment'. | |
| ISO9001-2015-7.1.1-02 | 7.1.1 | Partial | Low | §7.1Manual §7.1 states resources assessed at management review and during project planning; internal-vs-external capability/constraint consideration implied but not explicitly structured. |
| ISO9001-2015-7.1.2-01 | 7.1.2 | Full | §7.1Manual §7.1 and §7.2 determine and provide persons with appropriate competence for effective QMS implementation. | |
| ISO9001-2015-7.1.3-01 | 7.1.3 | Partial | Low | §7.1Manual §7.1 mentions infrastructure (offices, IT systems, vehicles, equipment) at summary level; specific infrastructure determination/maintenance process not detailed. |
| ISO9001-2015-7.1.4-01 | 7.1.4 | Partial | Low | §7.1Manual §7.1 mentions 'work environment appropriate for service delivery'; ISO 7.1.4 psychological/social/physical factor framework not explicitly addressed. |
| ISO9001-2015-7.1.5.1-01 | 7.1.5.1 | Full | §9.2Manual §9.2 Calibrated and Verified Monitoring Equipment commits to monitoring/measurement equipment calibrated or verified at specified intervals (fuel flow meters, noise meters, weighbridges, spill volume, gas detectors). | |
| ISO9001-2015-7.1.5.1-02 | 7.1.5.1 | Full | §9.2Manual §9.2 specifies verification method and frequency per equipment type (OEM certificate, NMI-traceable verification, lab calibration, field bump test); out-of-calibration equipment removed from service to maintain fitness. | |
| ISO9001-2015-7.1.5.1-03 | 7.1.5.1 | Full | §9.2Manual §9.2 maintains a calibrated and verified equipment register; calibration and verification records are retained in accordance with GOV-SCH-001. | |
| ISO9001-2015-7.1.6-01 | 7.1.6 | Partial | Low | §4.1Manual §4.1.2 identifies 'workforce competence, restricted operation licensing, succession planning for specialist roles' as an internal issue; §7.2 Competence addresses acquisition. ISO 7.1.6 determination of organisational knowledge not a dedicated Manual section. |
| ISO9001-2015-7.2-01 | 7.2 | Full | Competence requirements. | |
| ISO9001-2015-7.3-01 | 7.3 | Full | ||
| ISO9001-2015-7.4-01 | 7.4 | Full | §7.4Manual §7.4 states 'structured internal and external communication processes'; ISO 7.4 a)–e) parameters (what, when, with whom, how, who communicates) not individually enumerated. | |
| ISO9001-2015-7.5.1-01 | 7.5.1 | Full | WMS Manual — top-level documented information register. | |
| ISO9001-2015-8.1-01 | 8.1 | Full | §8.1Manual §8.1: 'Westlink plans, implements, and controls operational processes to meet requirements for service delivery' — considering client requirements, legislation, risk, resources, WHS hazards, environmental aspects. | |
| ISO9001-2015-8.1-02 | 8.1 | Partial | Medium | §8.1Manual §8.1 implies output suitability through proportional controls; not an explicit statement. |
| ISO9001-2015-8.1-03 | 8.1 | Full | §6.3Manual §6.3 Management of Change explicitly addresses planned changes (identify, assess risks, plan, communicate, verify effectiveness) and changes affecting WMS scope are CEO-approved. | |
| ISO9001-2015-8.1-04 | 8.1 | Full | §8.3Manual §8.3 covers control of outsourced processes via tiered prequalification (GOV-PRO-003/005), performance monitoring, and contractor WHS requirements (QHSE-GDL-001). | |
| ISO9001-2015-8.4.1-01 | 8.4.1 | Full | Supplier control section. | |
| ISO9001-2015-8.4.1-02 | 8.4.1 | Partial | Medium | Supplier control section. |
| ISO9001-2015-8.4.1-03 | 8.4.1 | Full | Supplier control section. | |
| ISO9001-2015-8.4.1-04 | 8.4.1 | Full | Supplier control section. | |
| ISO9001-2015-8.4.2-01 | 8.4.2 | Full | Supplier control section. | |
| ISO9001-2015-8.4.2-02 | 8.4.2 | Partial | Medium | Supplier control section. |
| ISO9001-2015-8.5.1-01 | 8.5.1 | Full | §8.1Manual §8.1 (operational planning and control), §8.5 (WHS operational controls), §8.6 (environmental operational controls) collectively implement service provision under controlled conditions for logistics context. | |
| ISO9001-2015-8.5.1-02 | 8.5.1 | Partial | High | §8.5Manual §8.5/§8.6 cover SWMS, JHA, permits, PPE, competence; ISO 8.5.1 a)–h) (e.g., characteristics documented, validation of processes where output cannot be verified, prevention of human error, release/delivery/post-delivery) not all explicit for logistics service delivery. |
| ISO9001-2015-8.5.6-01 | 8.5.6 | Partial | Low | |
| ISO9001-2015-8.5.6-02 | 8.5.6 | Partial | Low | |
| ISO9001-2015-8.7.1-01 | 8.7.1 | Full | ||
| ISO9001-2015-8.7.1-02 | 8.7.1 | Full | ||
| ISO9001-2015-8.7.1-03 | 8.7.1 | Full | ||
| ISO9001-2015-8.7.1-04 | 8.7.1 | Full | ||
| ISO9001-2015-8.7.1-05 | 8.7.1 | Full | ||
| ISO9001-2015-8.7.2-01 | 8.7.2 | Full | ||
| ISO9001-2015-9.1.1-01 | 9.1.1 | Full | §9.1Manual §9.1 restates ISO intent ('determines what needs to be monitored and measured, methods, timing, analysis timing') but the specific determinations are in the management system platform and QHSE-PRO procedures rather than the Manual itself. | |
| ISO9001-2015-9.1.1-02 | 9.1.1 | Full | §9.4Manual §9.4 Management Review explicitly assesses continuing suitability, adequacy, and effectiveness of the WMS — ISO 9.1.1 evaluation is delivered through the management review process. | |
| ISO9001-2015-9.1.1-03 | 9.1.1 | Full | §9.4Manual §9.4: 'Management review records are retained in the management system platform.' Documented information retained. | |
| ISO9001-2015-9.1.2-01 | 9.1.2 | Full | §9.2Manual §9.2: Westlink monitors client satisfaction through project meetings, verbal feedback, formal feedback records, and post-project reviews. | |
| ISO9001-2015-9.1.2-02 | 9.1.2 | Full | §9.2Manual §9.2 describes methods (project meetings, verbal feedback, formal feedback records, post-project reviews) and trend analysis at management review. | |
| ISO9001-2015-9.1.3-01 | 9.1.3 | Partial | Medium | §9.4Manual §9.4.1 Management Review Inputs include WMS performance data, nonconformities, audit results — analysis occurs but Manual does not describe analysis methodology. |
| ISO9001-2015-9.1.3-02 | 9.1.3 | Partial | Medium | §9.4Manual §9.4.1 inputs cover most of ISO 9.1.3 a)–g) (conformity, satisfaction, QMS performance, action effectiveness, supplier performance, improvement needs) but not individually enumerated against ISO headings. |
| ISO9001-2015-9.2.1-01 | 9.2.1 | Full | §9.3Manual §9.3: Westlink conducts internal audits at planned intervals to verify conformity to ISO 9001/45001/14001 and WMS requirements; audit programme considers process importance, changes, prior results. | |
| ISO9001-2015-9.2.2-01 | 9.2.2 | Full | §9.3Manual §9.3 covers audit frequency (at least annually per process + trigger-based), auditor competence and independence, findings classified (NCR/observation/OFI) and tracked through corrective action. | |
| ISO9001-2015-9.3.1-01 | 9.3.1 | Full | §9.4Manual §9.4: 'CEO chairs an annual management review to assess the continuing suitability, adequacy, and effectiveness of the WMS.' | |
| ISO9001-2015-9.3.2-01 | 9.3.2 | Full | §9.4.1Manual §9.4.1 enumerates Management Review Inputs: prior actions, external/internal issue changes, performance data, client satisfaction, resource adequacy, risk/opportunity effectiveness, improvement opportunities. | |
| ISO9001-2015-9.3.3-01 | 9.3.3 | Full | §9.4.2Manual §9.4.2 enumerates outputs: continual improvement decisions, WMS changes, resource requirements, updated objectives/targets. | |
| ISO9001-2015-9.3.3-02 | 9.3.3 | Full | §9.4Manual §9.4: 'Management review records are retained in the management system platform.' | |
| ISO9001-2015-10.1-01 | 10.1 | Full | §10.3Manual §10.3 Continual Improvement identifies and selects improvement opportunities via performance analysis, audit findings, lessons learned, worker consultation, benchmarking, technology adoption. | |
| ISO9001-2015-10.1-02 | 10.1 | Partial | Low | §10.3Manual §10.3 covers WMS effectiveness improvement; ISO 10.1 a)–c) (improve products/services to meet and anticipate needs; correct/prevent/reduce undesired effects; improve QMS performance) not individually enumerated. |
| ISO9001-2015-10.2.1-01 | 10.2.1 | Full | ||
| ISO9001-2015-10.2.1-02 | 10.2.1 | Full | ||
| ISO9001-2015-10.2.2-01 | 10.2.2 | Full | ||
| ISO9001-2015-10.3-01 | 10.3 | Full | §10.3Manual §10.3: 'Westlink continually improves the suitability, adequacy, and effectiveness of the WMS.' | |
| ISO9001-2015-10.3-02 | 10.3 | Partial | Low | §10.3Manual §10.3 lists improvement inputs but does not explicitly state that analysis results and management review outputs are considered to determine need/opportunity for action. |
JOSCAR-AU 2026(12)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| JOSCAR-Q1.3.1 | Q1.3.1 | Full | §1Manual §1 Purpose identifies Westlink Logistics Pty Ltd (ABN 25 058 919 305, ACN 058 919 305) as the legal entity. | |
| JOSCAR-Q1.3.2 | Q1.3.2 | Full | §1Manual §1 identifies ABN 25 058 919 305. | |
| JOSCAR-Q1.3.13 | Q1.3.13 | Full | §1Manual §1 identifies Westlink as an Australian incorporated entity. Ownership held by Australian directors. | |
| JOSCAR-Q1.4.9 | Q1.4.9 | Full | Integrated Management System Manual scopes ISO 9001, ISO 14001 and ISO 45001 certification. | |
| JOSCAR-Q1.5.5 | Q1.5.5 | Partial | Medium | §1Manual §1 scopes Australian operations; workforce is 100% Australia-resident. |
| JOSCAR-Q1.9.11 | Q1.9.11 | Full | Integrated Management System Manual — records management in documented information controls. | |
| JOSCAR-Q2.2.3 | Q2.2.3 | Full | Integrated Management System Manual references competency/training obligations. | |
| JOSCAR-Q2.2.4 | Q2.2.4 | Full | Integrated Management System Manual references induction obligations. | |
| JOSCAR-Q2.6.10 | Q2.6.10 | Full | Integrated Management System Manual references HVNL obligations. | |
| JOSCAR-Q2.6.11 | Q2.6.11 | Full | Integrated Management System Manual — risk management process. | |
| JOSCAR-Q2.6.12 | Q2.6.12 | Full | Integrated Management System Manual references emergency preparedness obligations. | |
| JOSCAR-Q2.9.13 | Q2.9.13 | Partial | Medium | Integrated Management System Manual references risk management. |
Sex Discrimination Act 1984 (Cth) — Positive Duty + AHRC Seven Standards(1)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| AHRC-PD-04 | AHRC Guidelines for Complying with the Positive Duty (2023) — Standard 4 Risk management | Full | §6.1.2Sexual harassment and sex-based harassment treated as psychosocial hazards under the WMS, integrated into the WHS risk assessment process (ISO 45001 cl.6.1.2 anchor). |
Work Health and Safety Act 2020 (WA)(5)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| WHS-WA-19-01 | WHS Act 2020 (WA) s.19 | Full | §5.1Manual §5.1 commits to primary duty of care across all WMS operations. | |
| WHS-WA-27-01 | WHS Act 2020 (WA) s.27 | Partial | Low | §5.1Manual §5.1 leadership commitment and executive responsibilities address officer due diligence at management system level. |
| WHS-WA-38-01 | WHS Act 2020 (WA) s.38 | Full | §10.2Manual §10.2 incident investigation and reporting procedures reference WorkSafe notification obligations and escalation paths. | |
| WHS-WA-39-01 | WHS Act 2020 (WA) s.39 | Full | §10.2Manual §10.2 incident reporting references scene management; verify explicit s.39 site-preservation requirements are documented. | |
| WHS-WA-50-01 | WHS Act 2020 (WA) Part 5 Div 3-4 (ss.50-79) | Partial | Low | §7.4Manual §7.4 references worker consultation including HSR provisions. |
Workers' Compensation and Injury Management Act 2023 (WA)(2)
| Requirement | Clause | Coverage | Severity | Notes |
|---|---|---|---|---|
| WCIM-INS-01 | WCIM Act 2023 (WA) s.202 | Full | §11.3Manual §11.3 legal compliance monitoring references insurance obligations. Workers' compensation insurance maintained via broker. | |
| WCIM-INS-02 | WCIM Act 2023 (WA) s.204 | Full | §11.3Insurance maintained continuously. Penalty awareness for executive due diligence. |
Declared compliance references (293)
AHRC-PD-04CSA-RR-01DSPF-A16.1-all-01DSPF-A16.1-all-02DSPF-A16.1-all-03DSPF-A16.1-all-04DSPF-A16.1-entry-gov-01DSPF-A16.1-entry-gov-02DSPF-A16.1-entry-gov-03DSPF-A16.1-entry-gov-04DSPF-A16.1-entry-gov-09DSPF-A16.1-entry-gov-cso-so-01DSPF-A16.1-entry-gov-cso-so-02DSPF-A16.1-entry-pers-01DSPF-A16.1-entry-pers-02DSPF-A16.1-entry-pers-05DSPF-A16.1-entry-pers-cso-so-01DSPF-A16.1-entry-pers-cso-so-02DSPF-A16.1-entry-phys-01DSPF-A16.1-entry-phys-02DSPF-C16.1-cso-01DSPF-C16.1-cso-02DSPF-C16.1-cso-03DSPF-C16.1-elig-01DSPF-C16.1-elig-02DSPF-C16.1-elig-05DSPF-C16.1-ongoing-01DSPF-C16.1-ongoing-02DSPF-C16.1-ongoing-03DSPF-C16.1-ongoing-04DSPF-C16.1-ongoing-05DSPF-C16.1-ongoing-06DSPF-C16.1-so-01DSPF-C16.1-so-03DSPF-C16.1-so-04DSPF-C16.1-so-05HVNL-SYS-01HVNL-SYS-06ISO14001-2026-10.1-01ISO14001-2026-10.2-01ISO14001-2026-10.2-02ISO14001-2026-10.2-03ISO14001-2026-4.1-01ISO14001-2026-4.1-02ISO14001-2026-4.2-01ISO14001-2026-4.3-01ISO14001-2026-4.3-02ISO14001-2026-4.3-03ISO14001-2026-4.3-04ISO14001-2026-4.4-01ISO14001-2026-4.4-02ISO14001-2026-5.1-01ISO14001-2026-5.2-01ISO14001-2026-5.3-01ISO14001-2026-5.3-02ISO14001-2026-6.1.1-01ISO14001-2026-6.1.1-02ISO14001-2026-6.1.2-01ISO14001-2026-6.1.2-02ISO14001-2026-6.1.2-03ISO14001-2026-6.1.2-04ISO14001-2026-6.1.2-05ISO14001-2026-6.1.2-06ISO14001-2026-6.1.3-01ISO14001-2026-6.1.3-02ISO14001-2026-6.1.4-01ISO14001-2026-6.1.4-02ISO14001-2026-6.1.5-01ISO14001-2026-6.2.1-01ISO14001-2026-6.2.1-02ISO14001-2026-6.3-01ISO14001-2026-6.3-02ISO14001-2026-7.1-01ISO14001-2026-7.2-01ISO14001-2026-7.2-02ISO14001-2026-7.3-01ISO14001-2026-7.4.1-01ISO14001-2026-7.4.1-02ISO14001-2026-7.4.1-03ISO14001-2026-7.4.1-04ISO14001-2026-7.4.2-01ISO14001-2026-7.4.3-01ISO14001-2026-7.5.1-01ISO14001-2026-7.5.2-01ISO14001-2026-7.5.3-01ISO14001-2026-7.5.3-02ISO14001-2026-8.1-01ISO14001-2026-8.1-02ISO14001-2026-8.1-03ISO14001-2026-8.1-04ISO14001-2026-8.1-05ISO14001-2026-8.1-06ISO14001-2026-8.2-01ISO14001-2026-8.2-02ISO14001-2026-8.2-03ISO14001-2026-9.1.1-01ISO14001-2026-9.1.1-02ISO14001-2026-9.1.1-03ISO14001-2026-9.1.1-04ISO14001-2026-9.1.1-05ISO14001-2026-9.1.2-01ISO14001-2026-9.1.2-02ISO14001-2026-9.1.2-03ISO14001-2026-9.2.1-01ISO14001-2026-9.2.2-01ISO14001-2026-9.2.2-02ISO14001-2026-9.2.2-03ISO14001-2026-9.2.2-04ISO14001-2026-9.3.1-01ISO14001-2026-9.3.2-01ISO14001-2026-9.3.3-01ISO14001-2026-9.3.3-02ISO45001-2018-10.1-01ISO45001-2018-10.2-01ISO45001-2018-10.2-02ISO45001-2018-10.2-03ISO45001-2018-10.2-04ISO45001-2018-10.2-05ISO45001-2018-10.3-01ISO45001-2018-4.1-01ISO45001-2018-4.2-01ISO45001-2018-4.3-01ISO45001-2018-4.3-02ISO45001-2018-4.3-03ISO45001-2018-4.3-04ISO45001-2018-4.4-01ISO45001-2018-5.1-01ISO45001-2018-5.2-01ISO45001-2018-5.3-01ISO45001-2018-5.3-02ISO45001-2018-5.3-03ISO45001-2018-5.4-01ISO45001-2018-5.4-02ISO45001-2018-6.1.1-01ISO45001-2018-6.1.1-02ISO45001-2018-6.1.1-03ISO45001-2018-6.1.1-04ISO45001-2018-6.1.1-05ISO45001-2018-6.1.2.1-01ISO45001-2018-6.1.2.1-02ISO45001-2018-6.1.2.2-01ISO45001-2018-6.1.2.2-02ISO45001-2018-6.1.2.2-03ISO45001-2018-6.1.2.3-01ISO45001-2018-6.1.3-01ISO45001-2018-6.1.3-02ISO45001-2018-6.1.4-01ISO45001-2018-6.1.4-02ISO45001-2018-6.1.4-03ISO45001-2018-6.2.1-01ISO45001-2018-6.2.1-02ISO45001-2018-6.2.2-01ISO45001-2018-6.2.2-02ISO45001-2018-7.1-01ISO45001-2018-7.2-01ISO45001-2018-7.3-01ISO45001-2018-7.4.1-01ISO45001-2018-7.4.1-02ISO45001-2018-7.4.1-03ISO45001-2018-7.4.1-04ISO45001-2018-7.4.1-05ISO45001-2018-7.4.1-06ISO45001-2018-7.4.2-01ISO45001-2018-7.4.3-01ISO45001-2018-7.5.1-01ISO45001-2018-7.5.2-01ISO45001-2018-7.5.3-01ISO45001-2018-7.5.3-02ISO45001-2018-7.5.3-03ISO45001-2018-8.1.1-01ISO45001-2018-8.1.1-02ISO45001-2018-8.1.2-01ISO45001-2018-8.1.3-01ISO45001-2018-8.1.3-02ISO45001-2018-8.1.4.1-01ISO45001-2018-8.1.4.2-01ISO45001-2018-8.1.4.2-02ISO45001-2018-8.1.4.2-03ISO45001-2018-8.1.4.3-01ISO45001-2018-8.1.4.3-02ISO45001-2018-8.1.4.3-03ISO45001-2018-8.2-01ISO45001-2018-8.2-02ISO45001-2018-9.1.1-01ISO45001-2018-9.1.1-02ISO45001-2018-9.1.1-03ISO45001-2018-9.1.1-05ISO45001-2018-9.1.2-01ISO45001-2018-9.1.2-02ISO45001-2018-9.2.1-01ISO45001-2018-9.2.2-01ISO45001-2018-9.3-01ISO45001-2018-9.3-02ISO45001-2018-9.3-03ISO45001-2018-9.3-04ISO45001-2018-9.3-05ISO9001-2015-10.1-01ISO9001-2015-10.1-02ISO9001-2015-10.2.1-01ISO9001-2015-10.2.1-02ISO9001-2015-10.2.2-01ISO9001-2015-10.3-01ISO9001-2015-10.3-02ISO9001-2015-4.1-01ISO9001-2015-4.1-02ISO9001-2015-4.2-01ISO9001-2015-4.2-02ISO9001-2015-4.3-01ISO9001-2015-4.3-02ISO9001-2015-4.3-03ISO9001-2015-4.3-04ISO9001-2015-4.3-05ISO9001-2015-4.4.1-01ISO9001-2015-4.4.2-01ISO9001-2015-5.1.1-01ISO9001-2015-5.1.2-01ISO9001-2015-5.2.2-01ISO9001-2015-5.3-01ISO9001-2015-5.3-02ISO9001-2015-6.1.1-01ISO9001-2015-6.1.2-01ISO9001-2015-6.1.2-02ISO9001-2015-6.2.1-01ISO9001-2015-6.2.1-02ISO9001-2015-6.2.1-03ISO9001-2015-6.2.2-01ISO9001-2015-6.3-01ISO9001-2015-6.3-02ISO9001-2015-7.1.1-01ISO9001-2015-7.1.1-02ISO9001-2015-7.1.2-01ISO9001-2015-7.1.3-01ISO9001-2015-7.1.4-01ISO9001-2015-7.1.5.1-01ISO9001-2015-7.1.5.1-02ISO9001-2015-7.1.5.1-03ISO9001-2015-7.1.6-01ISO9001-2015-7.2-01ISO9001-2015-7.3-01ISO9001-2015-7.4-01ISO9001-2015-7.5.1-01ISO9001-2015-8.1-01ISO9001-2015-8.1-02ISO9001-2015-8.1-03ISO9001-2015-8.1-04ISO9001-2015-8.4.1-01ISO9001-2015-8.4.1-02ISO9001-2015-8.4.1-03ISO9001-2015-8.4.1-04ISO9001-2015-8.4.2-01ISO9001-2015-8.4.2-02ISO9001-2015-8.5.1-01ISO9001-2015-8.5.1-02ISO9001-2015-8.5.6-01ISO9001-2015-8.5.6-02ISO9001-2015-8.7.1-01ISO9001-2015-8.7.1-02ISO9001-2015-8.7.1-03ISO9001-2015-8.7.1-04ISO9001-2015-8.7.1-05ISO9001-2015-8.7.2-01ISO9001-2015-9.1.1-01ISO9001-2015-9.1.1-02ISO9001-2015-9.1.1-03ISO9001-2015-9.1.2-01ISO9001-2015-9.1.2-02ISO9001-2015-9.1.3-01ISO9001-2015-9.1.3-02ISO9001-2015-9.2.1-01ISO9001-2015-9.2.2-01ISO9001-2015-9.3.1-01ISO9001-2015-9.3.2-01ISO9001-2015-9.3.3-01ISO9001-2015-9.3.3-02JOSCAR-Q1.3.1JOSCAR-Q1.3.13JOSCAR-Q1.3.2JOSCAR-Q1.4.9JOSCAR-Q1.5.5JOSCAR-Q1.9.11JOSCAR-Q2.2.3JOSCAR-Q2.2.4JOSCAR-Q2.6.10JOSCAR-Q2.6.11JOSCAR-Q2.6.12JOSCAR-Q2.9.13WCIM-INS-01WCIM-INS-02WHS-WA-19-01WHS-WA-27-01WHS-WA-38-01WHS-WA-39-01WHS-WA-50-01
Document Revision Summary
| Rev | Issued | Document Ref | Document Title | Author | Approved |
|---|---|---|---|---|---|
| 10 | 05/06/2026 | QHSE-MAN-001 | Westlink Management System Manual | Craig Foreman | Pending CEO approval |
| 9 | 11/05/2026 | QHSE-MAN-001 | Westlink Management System Manual | Craig Foreman | CEO (JDG) |
| 8 | 13/03/2026 | QHSE-MAN-001 | Westlink Management System Manual | Craig Foreman | CEO (JDG) |
| 7 | 10/11/2025 | WLK-GBL-QHSE-MAN-001 | WMS Manual | Nick Webb | CEO (JDG) |
| 6 | 07/10/2022 | WLK-GBL-QHSE-MAN-001 | WMS Manual | Nick Webb | CEO (JDG) |
Document Revision Details
| Rev | Purpose of revision and changes made |
|---|---|
| 10 | Removed the ISO 9001 cl 8.3 design-and-development exclusion (re-determined Applicable): cl 8.3 is now in scope and controlled by the new OPS-PRO-004 (Solutions Design Procedure); the 12 cl-8.3 register IDs are redirected from the manual to OPS-PRO-004, and a design-and-development scope-boundary note (engineered solutions in scope; freight-forwarding pass-through excepted) is added to the Scope section. Compliance wiring (batch 6a + 6c): 269 distinct register IDs now anchored to 38 Traceability Matrix elements. Batch 6a (260 IDs) covered the ISO trio (ISO 9001:2015, ISO 14001:2026, ISO 45001:2018, plus 1 retained ISO 14001:2015 cite). Batch 6c (+9 IDs) added non-ISO sector frameworks: workers-comp-wa (6: WCIM-INS-01/02/03 to legal-and-other-requirements; WCIM-CLM-01/02 + WCIM-IMS-01 to incident-investigation), hvnl-cor (2: HVNL-SYS-01 to chain-of-responsibility; HVNL-SYS-06 to management-review), sda-positive-duty (1: AHRC-PD-04 to hazard-identification under psychosocial). TRACEABILITY array converted from 2-tuple (element, clause-string) to 2-tuple (element, [register-IDs]) — matrix appendix now renders one row per register ID with requirement text pulled from the compliance register. Added 2 new TRACEABILITY elements: 'Planning — planning of changes' (cl.6.3) and 'Operations — service provision and nonconforming output' (cl.8.5, cl.8.7). Row 8 (worker consultation) clause coverage extended to WHS Act ss.50-79 to absorb HSR/HSC overlay (WHS-WA-50-01). Calibrated equipment row gains ISO 9001 cl.7.1.5.1 IDs flipping Coverage Gap→Full. Manifest emission infrastructure added to generate_document.py via new scripts/lib/compliance_manifest.py shared with generate_policy.py. |
| 9 | ISO 14001:2026 transition. Added Life Cycle Perspective subsection under Operations (cl.8.1) covering acquisition, service design, use, maintenance, end-of-life, and external communication. Added Calibrated and Verified Monitoring Equipment subsection under Performance Evaluation (cl.9.1.1) with register table covering fuel-flow telematics, noise meters, weighbridges, spill measurement, and gas detectors. Updated ISO 14001:2015 citations to ISO 14001:2026 throughout (certification statement, scope, policy framework, standards reference). Closed 2 surviving Medium Gaps from rev 8 evidence mapping (ISO14001-2026-8.1-05 life-cycle perspective; ISO14001-2026-9.1.1-03 calibrated equipment). 53 Full / 26 Partial / 0 Gap across 79 reqs in iso-14001-2026.md. |
| 8 | Major rewrite: restructured to §2.5 narrative manual format; expanded to genuinely integrated Q+WHS+E scope; updated all document codes to new WMS convention; updated legislation references; embedded organisational chart; added objectives framework and performance monitoring tables.• Restructured from ISO 9001 clause-numbered format to §2.5 narrative manual structure — sections now follow logical flow rather than standard clause sequence.• Expanded scope from quality-dominant to genuinely integrated Quality, WHS, and Environmental coverage — WHS operational controls (SWMS, JHA, hierarchy of controls) and environmental controls (spill prevention, waste management, heritage protection) now substantive.• Added interested parties register summary table with needs, expectations, and WMS requirements mapping.• Embedded current organisational chart with IMS responsibilities per role.• Listed complete policy suite (22 policies with codes and primary standard/obligation).• Added WMS objectives framework with measurable targets across quality, WHS, and environmental domains.• Added performance monitoring framework table covering all three management system disciplines.• Updated all document codes from legacy WLK-GBL-* convention to new {Dept}-{DocType}-{Seq} format.• Updated legislation references — WC&IM Act 2023, PSPF 2025, WHS Regulations 2022 (WA).• Removed §10.2.1 'Control of Non-conforming Products' — inapplicable to logistics service company; replaced with service delivery nonconformity process.• Merged duplicated §10/§11 improvement sections into single section.• Described isCompliant as the implementation platform, not the process itself — principles apply regardless of platform.• Updated Singapore operations — now under Westlink Logistics directly (subsidiary deregistered). |
| 7 | Added climate change context to §4.1 and §4.2. |
| 6 | Re-identified to WLK-GBL-QHSE-MAN-001. Renamed to WMS Manual. |